Download presentation
Presentation is loading. Please wait.
Published byGwenda Brooks Modified over 9 years ago
1
Process WG Summary Austin, TX October 26, 2007
2
Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Meetings: Europe – June 10, 2008 – June 13, 2008 in Vasteras, Sweden North American – early November, 2008 in TBD Asia – Beijing, China in conjunction with TC57 Plenary in South Korea on October 6 – 10, 2008 Web site: Money budgeted for professional job Randy Rhodes will work with Marketing to complete job
3
Process WG Task List: Migrate CIM email list process to Sharepoint. Create new document views for archived documents. Design and create CIM Issues List Redesign public home page Set up "European Interest" list Rearrange the Quick Launch panel to suit users. Add text to marquee, or remove. Set up sub-sites as required for CIM groups. Add a CIM Products area. Post IEC WG drafts for WG13
4
Process WG Public content of web site: Registration required: –Official current release of CIM –Presentations –Tutorial material –Edited Issues List using Sharepoint features for entering new issues Anonymous: –Marketing material
5
Process WG Private content of web site: –Back releases of CIM –WG material –Draft IEC documents Distributech: –Support session on CIMug E-mail collaboration: –Checkout new Sharepoint features
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.