Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver
2
End of Season 2000 - Lower West Pod and Wing Wall ~ 75% Done
3
East Bond Beam Complete
4
Two Cement Mixers Going for Continuous Bond Beam Pour
5
Two Bond Beams Done, Prep for Footings, Looking South (Pod 1)
6
Later 201 2 pods up stairs, 3 rd mostly done
7
2001 After Footings done –Framing East Doorway - Looking North East (Pod 1)
8
Near end of 2001 – Post and Beam Wall Done
9
Building Materials – Refuse at Mica Processing Plant
10
Free for the Taking, if you Wear the Right Gear
11
Third Bond Beam and Trash Cans of Mica Sand
12
End of 2001 – All but 120 Tires Pounded
13
Building Materials – 700 Free Tires, Delivered!