Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress on Absorber Heater and Instrumentation, Absorber R&D Shigeru Ishimoto KEK AFC Phone Meeting Jan-27, 2005.

Similar presentations


Presentation on theme: "Progress on Absorber Heater and Instrumentation, Absorber R&D Shigeru Ishimoto KEK AFC Phone Meeting Jan-27, 2005."— Presentation transcript:

1 Progress on Absorber Heater and Instrumentation, Absorber R&D Shigeru Ishimoto KEK AFC Phone Meeting Jan-27, 2005

2 HEATER for MICE ABSORBER/CRYOCOOLER HTR-25-100

3 Thermometer and Absorber Level Meter AC Bridge 370S CX-1050-SD 3716; 16ch Scanner

4 PC / WS MICE ABSORBER MONITOR/CONTROL IEEE-488 Keithley/ADCAC Bridge 370SDCPS READ OUTS 16 CX-1050SD’s DMR 1-6 3-HTR 5-CX-1050 P&VAC Sensors Abs. HTR-UP CRYOCOOL HTR Programmable Controller or Relay DIO ALRAM, VALVES, CRYOCOOLER-OFF, HEATER-OFF… DCPS Abs. HTR-DWN LAN Abs. LEVEL CX-1050 cc1mA DIRECT CONTROL CRYOSTAT Inside Abs.

5 (EXCEL FILE) http://ishimotopc2.kek.jp/MICE-Instruments.xls

6 DIGITAL METER RELAY for MICE ABSORBER/CRYOCOOLER DMR; DIGITAL METER RELAY (Digital comparator) Watanabe (Japan) for example INPUT WSM-452HR-R3NNNX-22VD ; DC 0-199.99 mV WSM-452HR-R3NNNX-32VD ; DC 0-1.9999 V WSM-452HR-R3NNNX-42VD ; DC 0-19.999 V WSM-452HR-R3NNNX-52VD ; DC 0-199.99 V OUTPUT( 4.5 digit set) HI-relay (NC, HO) LO-relay (NC, NO) Scaling; A-B (V)  C-D (Unit) DC24V


Download ppt "Progress on Absorber Heater and Instrumentation, Absorber R&D Shigeru Ishimoto KEK AFC Phone Meeting Jan-27, 2005."

Similar presentations


Ads by Google