Presentation is loading. Please wait.

Presentation is loading. Please wait.

DOM MB Rev 4.2 to Rev 5.0 Changes April 26, 2004 Gerald Przybylski Lawerence Berkeley National Laboratory.

Similar presentations


Presentation on theme: "DOM MB Rev 4.2 to Rev 5.0 Changes April 26, 2004 Gerald Przybylski Lawerence Berkeley National Laboratory."— Presentation transcript:

1 DOM MB Rev 4.2 to Rev 5.0 Changes April 26, 2004 Gerald Przybylski Lawerence Berkeley National Laboratory

2 Review, May 5, 2004Lawerence Berkeley National Laboratory 2 History Rev 1, January 3, 2003, Translation from OrCAD Rev 2, April 9, 2003, Booting & Memory troubles Rev 3, September 2, 2003, Clamping troubles Rev 4.1, February 3, 2004, ~ 110 changes incorporated Rev 4.2, March 15, 2004, ~ 12 more changes

3 Review, May 5, 2004Lawerence Berkeley National Laboratory 3 Status & Requirements Rev 4.2 Meets Performance Requirements BOM Mature, Minimized, Qualified Last batch: 20 cards; not loading errors, 1 solder bridge, 1 cold solder, 1 tombstone. Mechanical Tweaks Little Time Left for Improvements Changes Carry Risk

4 Review, May 5, 2004Lawerence Berkeley National Laboratory 4 Circuitry  Shield between DOMMB and delay for PS noise - Reduce EMI pick-up  Shield over 7W DC-DC converter - Reduce EMI pick-up  Add Bypass capacitors at ATWD for PS noise - Filter noise +Add 1.8V SDRAM Memory Power Option - One 0603 Jumper Footprint +Add enhancement for LC Tx Idle Restoration - Two 0603 Resistor Footprints & Traces

5 Review, May 5, 2004Lawerence Berkeley National Laboratory 5 Design for Manufacturability & for Integration Move/Modify Signal Connections - Twisted Pair Attachments Become Posts - Relocate RA SMB PMT Signal Connector DNL (do not load) TP25 - Resolve Interference with RA SMB 0.005” trace/space feasibility - Toward Full IPC 6012 Class 3 Compliance Serial number relocation - Enable inspection for sealed DOM

6 Review, May 5, 2004Lawerence Berkeley National Laboratory 6 Reliability Related Delete (?) Panasonic CM Inductor →Eliminate Capacitors with Pure Tin Leads - by Footprint Changes, 0603 → 0805 Miscellaneous No-Load hard and soft reboot push buttons Various loading clarifications in schematic

7 Review, May 5, 2004Lawerence Berkeley National Laboratory 7 Remaining Issues Communications Balun(s) Shielding/Moving DC-DC Converter to Suppress EMI consistently below ¼ SPE Timely Delivery of Corning Oscillators Tin on Corning Oscillator Components Undiscovered Integration Issues

8 Review, May 5, 2004Lawerence Berkeley National Laboratory 8 Conclusion Significant progress in the last year. Converging (or converged?) The performance is there. Small worries remain


Download ppt "DOM MB Rev 4.2 to Rev 5.0 Changes April 26, 2004 Gerald Przybylski Lawerence Berkeley National Laboratory."

Similar presentations


Ads by Google