Presentation is loading. Please wait.

Presentation is loading. Please wait.

F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Similar presentations


Presentation on theme: "F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014."— Presentation transcript:

1 F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014

2 Latest Experiments http://www-ppd.fnal.gov/FTBF/2 Jan 22 – Feb 4 –T-1042 (Muon g-2) –T-992 Rad-Hard Sensors for SLHC Feb 5 – 26 super PHENIX –T-1044 – 5 ton Hadron calorimeter –T-1048 – Time-of-flight system –T-1037 – (FLYSUB) GEM detectors –T-1054 – pre-shower calorimeter http://www-ppd.fnal.gov/FTBF/schedule

3 Current Status sPHYNIX taking data Rotating table available! (and other small stages) MCenter Control Room: –Heat On! –Shielding blocks in place (to shield muon plume) –Moving Furniture (racks) in MCenter beamline: –MC2 Quad replacement (6 days to go) –Interlocks: Chipmunks & Key tree being placed Other LAriaT work: –Wire Chambers waiting on TDC’s, being assembled. http://www-ppd.fnal.gov/FTBF/3

4 Up Coming Experiments http://www-ppd.fnal.gov/FTBF/4 Feb 26 – Mar 19 –T-1018 – Spacordian Tungsten Fiber Calorimeter (UCLA) (STAR) –T-1036 – CMS High Rate Pixel tracker (Make-up slot) Mar 19 - –T-1041 – CMS Forward Calorimeter http://www-ppd.fnal.gov/FTBF/schedule

5 TSW’s In Progress http://www-ppd.fnal.gov/FTBF/5 T-1048, approved (taking data) T-1049, waiting on experimenter feedback T-1054, approved (taking data Weds) –extreme processing! T-1055, processing http://www-ppd.fnal.gov/FTBF/TSW Technical Scope of Work

6 ADDITIONAL SLIDES http://www-ppd.fnal.gov/FTBF/6

7 Facility Usage

8 Facility Weekly Usage http://www-ppd.fnal.gov/FTBF/8

9 Experiments & TSWs http://www-ppd.fnal.gov/FTBF/9

10 Beam Delivery http://www-ppd.fnal.gov/FTBF/10


Download ppt "F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014."

Similar presentations


Ads by Google