The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.

Similar presentations


Presentation on theme: "The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation."— Presentation transcript:

1 The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation into place

2 Concrete behind the window sills

3 Ready for the plasterers

4 Insulation in place

5 Pumping insulation into the cavity walls

6 Insulation in the garage roof

7 The plasterers first fix expanded metal to prevent cracking when the building is finished. They then apply a scratch coat of mortar and finish with a coat of carlite

8 Between wall and ceiling

9 Between door frame and window

10 Above the door frames

11 Around the fireplace

12 Scratch coat begins

13 Scratch coat finished

14 Carlite Finish arrives

15 Trestles to help the plasterer reach the ceiling

16 A finished ceiling

17 Finished walls


Download ppt "The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation."