The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation into place
2
Concrete behind the window sills
3
Ready for the plasterers
4
Insulation in place
5
Pumping insulation into the cavity walls
6
Insulation in the garage roof
7
The plasterers first fix expanded metal to prevent cracking when the building is finished. They then apply a scratch coat of mortar and finish with a coat of carlite
8
Between wall and ceiling
9
Between door frame and window
10
Above the door frames
11
Around the fireplace
12
Scratch coat begins
13
Scratch coat finished
14
Carlite Finish arrives
15
Trestles to help the plasterer reach the ceiling
16
A finished ceiling
17
Finished walls