Presentation is loading. Please wait.

Presentation is loading. Please wait.

GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center.

Similar presentations


Presentation on theme: "GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center."— Presentation transcript:

1 GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center

2 Slide: 2 Outline Staff change in GCC team Retro-processing status Product Update and Status GPPA vs. SCOPE-CM Maturity Matrix Possible solutions to promote the MW product Outcomes of 2013 Users’ Workshop Near term goals

3 Slide: 3 Staff Change in GCC New GCC Director – Dr. Lawrence (Larry) Flynn as the new GCC Director – Thanks Fuzhong Weng for his support to the GCC functions over the past six years. New GSICS Quarterly Editor – Dr. George Ohring as the GQ editor since Jan 2013

4 Slide: 4 GEO-LEO Retro-Processing @ Univ. Wisconsin Completed and Delivered the GOES vs AIRS retrospective GSICS processing done for GOES Imagers – GOES-08 through -12 Meteosat Second Generation (MSG) vs AIRS code installed and working at CIMSS – Some data delivered Proposed order for back-processing of non-GOES imagers: – MSG (MET-9 done, MET-started), MET-7 (done), MET-5 – MTSAT (GMS-5) – FY-2C – FY-2D – FY-2E MET-8 and MET-9 begun

5 Slide: 5 Product Updates Two GEO-LEO IR products in pre-Op phase – EUMETSAT vs. IASI product – GOES Imager vs. IASI product – MTSAT product is close to pre-Op, need the undergoing uncertainty analysis One new product in demonstration phase – NOAA (A)MSU LEO-LEO It is agreed that bias monitoring is a powerful tool, not a product.

6 Slide: 6 Update of GSICS Products Algorithm Type GPRCMonitored Instrument Reference Instrument GSICS NRT Correction GSICS Re- Analysis Correction GEO-LEO IREUMETSATMeteosatIASIPre-Op JMAMTSATIASI (+AIRS)Demo (close to pre-Op) NOAAGOES ImagerIASI (+AIRS/CrIS*) Pre-Op LEO-LEO Vis/NIR NOAAAVHRRMODISDemo LEO-LEO Microwave NOAA(A)MSU Demo *: Currently product is based on IASI. Plan to use AIRS/CrIS for the midnight correction Products in Demo and higher levels

7 Slide: 7 GEO-LEO IR Products in Development Algorithm Type GPRCMonitored Instrument Reference Instrument GSICS NRT Correction GSICS Re- Analysis Correction GEO-LEO IRCMAFY-2XIASI (+AIRS)In Development KAMCOMSIASI (+AIRS)In Development NOAAGOES Sounder IASI (+AIRS/CrIS) In Development

8 Slide: 8 New Products on Emerge GEO-LEO DCC visible products Algorithm Type GPRCMonitored Instr. Reference Instr. NRTCRe-Analysis GEO-LEO Vis DCC CMAFY-2XAqua MODIS Collection 6 In Development EUMETSATMeteosatIn Development KMACOMSIn Development JMAMTSATIn Development NOAAImagerIn Development

9 Slide: 9 GPPA vs. SCOPE MMI

10 Slide: 10 Challenges to promote MW products Very limit response to review the MW product – Only one panel responded to review part of the products Possible Solution – Re-organize the WM subgroup? – Cheng-Zhi Zou has identified additional reviewers – “One suggestion is that we probably need to have a microwave calibration meeting sometimes next year. STAR had such meetings in March 2010 on Microwave Sounding and Imagery and in 2011 on AMSU surface channels. These were very successful meetings. Now STAR has several groups working on microwave calibration and products. So a microwave meeting at NCWCP should be appealing to the community.” - email from C. Zou

11 Slide: 11 Outcomes of 2013 Users’ Workshop Users’ Request – Calibration alert system – Intermediate products such as SNO and GEO-LEO collocation data – UV and synthetic observation subgroups

12 Slide: 12 Near-term Goals GSICS Products GEO-LEO IR product in Operation phase DCC products in Demonstration Phase Create UV working group


Download ppt "GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center."

Similar presentations


Ads by Google