Presentation is loading. Please wait.

Presentation is loading. Please wait.

County Sanitation Districts of Los Angeles County Waste-by-Rail System WASTEWATER RECLAMATION SOLID WASTE MANAGEMENT.

Similar presentations


Presentation on theme: "County Sanitation Districts of Los Angeles County Waste-by-Rail System WASTEWATER RECLAMATION SOLID WASTE MANAGEMENT."— Presentation transcript:

1 County Sanitation Districts of Los Angeles County Waste-by-Rail System WASTEWATER RECLAMATION SOLID WASTE MANAGEMENT

2 MRF/ Loading Facility Remote Landfill Intermodal Facility Waste-by-Rail System Overview

3 Puente Hills Materials Recovery Facility

4 Puente Hills MRF

5 Typical Intermodal Operations

6 Puente Hills Intermodal Facility

7

8 Boundary of Project Related Work Off-street Access Two additional rail tracks for project use only Intermodal Facility

9 PH Rail Yard Development Schedule Preliminary Design2005 - 2007 Draft EIRSummer 2007 Final EIREnd 2007 Land Use Permit ConsiderationEarly 2008 Final Design2008 - 2009 PH Rail Yard Construction2009 – 2011 Waste-by-Rail Operational2011/2012

10 Waste-by-Rail Landfills Los Angeles County North Riverside County Orange County Ventura County San Diego County Salton Sea 8 5 15 10 210 405 Imperial County 111 Joshua Tree National Park EAGLE M OUNTAIN Ferrum Private Rail Line Union Pacific Main Line 7886 M ESQUITE

11 1992: Project introduced 1995: EIR completed 1999: Major permits received 2002: Sanitation Districts acquired project 2003 - Present: Design and construction 2009 – Landfill start-up 2011 – Rail operations Mesquite Landfill Project History

12 MSW (residential, commercial) 20,000 tons/day (5 trains) 1,000 tons/day - Imperial County 100 years capacity Mesquite Regional Landfill Overview

13 Mesquite Regional Landfill ChocolateMountainAerialGunneryRange MesquiteMine Highway 78 Union Pacific Railroad Sand Dunes Recreation Area Property Boundary (4,245 acres) FutureRailroadSpur Landfill Footprint (2,290 acres) Support Facilities (Train Unloading, etc.)

14 Mesquite Development Progress

15 MRL Roads & Drainage Project

16 Waste-by-Rail Development Schedule Mesquite Final Design2005 - 2007 Mesquite Construction2006 - 2008 Mesquite Rail Yard2008 - 2010 Mesquite Landfill Operations2009 PH Rail Yard Design2005 - 2008 PH Rail Yard Construction2009 – 2011 Waste-by-Rail Operational2011/2012

17 County Sanitation Districts of Los Angeles County Waste-by-Rail System WASTEWATER RECLAMATION SOLID WASTE MANAGEMENT


Download ppt "County Sanitation Districts of Los Angeles County Waste-by-Rail System WASTEWATER RECLAMATION SOLID WASTE MANAGEMENT."

Similar presentations


Ads by Google