Presentation is loading. Please wait.

Presentation is loading. Please wait.

Configuration Management of the CM-SAF radiation at the RMIB

Similar presentations


Presentation on theme: "Configuration Management of the CM-SAF radiation at the RMIB"— Presentation transcript:

1 Configuration Management of the CM-SAF radiation at the RMIB
S. Dewitte Royal Meteorological Institute of Belgium Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

2 Overview Configuration Management system Version 0.9 Version 1.0
Future versions Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

3 Configuration Management system
ConfigMan Responsibilities ConfigMan: Rolf Ullrich (CM-SAF, DWD) Local ConfigMan (in charge for integration) Petra Fuchs (DWD) Steven Dewitte (RMIB) Hardware Management at RMIB: RMIB IT devision Group Manager (S3-TOArad) Steven Dewitte Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

4 Configuration Management system
Utility used: PERFORCE providing version control, file sharing, release management, defect tracking, build management, and a few other things Server installed at DWD / Administration DWD Remote login from RMIB using ssh access to CM_SAF Toa_rad files from RMIB and DWD at RMIB: unix command line and web interface available Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

5 Version 0.9 version of Toa_rad executable programs tested at RMIB by DWD on 25-26/3/2003 programs were developed on LINUX PC tests were executed an DIGITAL Alpha server source code partly entered in Perforce by DWD Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

6 Version 1.0 editorial changes compared to version 0.9 (adding comments, …) tests were re-run source code and all auxiliary inputs (test description, test input files, …) entered in Perforce by RMIB on 23/5/2003 Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002

7 Future versions inclusion of Data Availability Manager functions for integration change of output grid new input formats (CERES,GERB) ... Software/System Integration Readiness Review - Initialisation Meeting , Brussel, 2-3/6/2002


Download ppt "Configuration Management of the CM-SAF radiation at the RMIB"

Similar presentations


Ads by Google