Presented by Trevor Higgins DBO Contract: Veolia Water
2
Introduction Limerick City's water treatment plant at Clareville is located on the banks of the Shannon near Castleconnell.
3
Background First phase of the treatment complex was completed in the 1890's and utilized the Shannon as a source of both raw water and power
4
Second Phase The second phase came at the end of the 1920's when the pumping arrangement had to give way because of a more spectacular development on the other side of the river.
5
Latest Phase In 1951, a further extension was completed increasing the capacity to 3.6 Million gallons/day (16,000m3/day) to cater for the growing demands of the city
6
Public Private Partnership The DBO option was preferred for Clareville Water Treatment Plant and a contractor has been in operation on the site since 2007. The upgrading of the Plant was officially opened on 25th June 2010. For Further information please read the attached brochure
7
Meeting The Needs through Innovation Clarifiers Actiflo Schematic Design and installation of Actiflo®, a high rate ballasted floc clarifier developed by Veolia Water, followed by highrate dual media filters. This provided a reliable process with a small footprint, less capital and operational costs which is well suited to treat rapid changes in raw water characteristics. https://www.youtube.com/watch?v=Jihn7DT3mxg
8
Meeting The Needs through Innovation Dusenflo Rapid Gravity Filter Measuring Success
9
Alum Sludge Drying Plant Design and installation of a sludge drier to dramatically reduce the volumes of aluminium sludge leaving the plant, and providing a product that can be reused in the industry.