Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at.

Similar presentations


Presentation on theme: "Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at."— Presentation transcript:

1 Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at El. 428 ft 10/21/20081ALDEN RESEARCH LABORATORY, INC.

2 General View of the CFD Model 10/21/20082 General View

3 Plan View of the CFD Model 10/21/20083

4 4

5 Velocity Contours at Water Surface 10/21/20085

6 Flow Patterns From the Tunnel Shaft to the Spillway 10/21/20086ALDEN RESEARCH LABORATORY, INC.

7 10/21/20087

8 8

9 9

10 10

11 10/21/200811

12 10/21/200812

13 10/21/200813

14 10/21/200814

15 10/21/200815

16 10/21/200816

17 10/21/200817

18 Flow Impacts Caused by Stacked Rock at the Ends of the Spillway Crest 10/21/200818ALDEN RESEARCH LABORATORY, INC.

19 10/21/200819

20 10/21/200820

21 Velocity Profiles Along the Ogee Spillway Section 10/21/200821ALDEN RESEARCH LABORATORY, INC.

22 10/21/200822

23 10/21/200823

24 10/21/200824

25 Hydraulic Jump at the Toe of the Spillway Velocity and Froude Number 10/21/200825ALDEN RESEARCH LABORATORY, INC.

26 10/21/200826

27 10/21/200827

28 Scour Potential In the Exit Channel, both Concrete Apron and Riprap Section 10/21/200828ALDEN RESEARCH LABORATORY, INC.

29 10/21/200829

30 10/21/200830

31 10/21/200831

32 10/21/200832

33 10/21/200833

34 10/21/200834

35 10/21/200835

36 10/21/200836

37 10/21/200837

38 10/21/200838

39 Water Surface Elevations At Spillway Crest and Upstream 10/21/200839ALDEN RESEARCH LABORATORY, INC.

40 10/21/200840

41 Pressure Forces On the Pipe Riser and Water Intake Screen 10/21/200841ALDEN RESEARCH LABORATORY, INC.

42 Pressure Force on Pipe Riser and Water Intake Time (second)X-Force (lbf)Y-Force (lbf)Z-Force (lbf)Total (lbf) Average1040547-10561580 10/21/200842