Download presentation
Presentation is loading. Please wait.
Published byCollin Singleton Modified over 8 years ago
1
Vision: Conceptual Map Connecting Communities 2.3 million people Over 40 destinations 7,300 sq. miles 15 counties Community Self- Determination
2
OVERALL MAP
3
ROUTE METRICS The metrics in this chart correspond to the route of the proposed Carolina Thread Trail in Lincoln County
4
OVERALL MAP
5
PRIORITIZATION 1) Near Population 2) Available Land/Right-of-Way 3) Functional Segment 4) Ease of Development 5) Available Funding
10
Design Guidelines: Paved Multi-Use Trail
11
Design Guidelines: Unpaved Multi-Use Trail
12
Design Guidelines: Street Based Trail
13
What does it mean to adopt this plan? This plan will not take the place of any existing plans, nor conflict with any future planning efforts. Adopting this Master Plan does not commit Lincolnton or the County to fund implementation itself. Once the route of The Thread has been adopted, grants will be available to provide seed funding for implementation of some segments of The Thread. Thread staff can and will assist local communities in creating a strategy for funding the implementation of their trails taking into consideration both private and public funding sources.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.