Download presentation
Presentation is loading. Please wait.
Published byLesley McLaughlin Modified over 8 years ago
1
Prosessing facilities
4
Manifold system
5
Statfjord process
6
The Tampen Area
9
Åsgard: Resurser og reserver
12
Main project activity in 2008 Long reach: development of composite cable Extended lubrication length +40 meter Coiled tubing from LWI/Category B Vessel: Improved RLWI Stack Software for prediction of sea/vessel interaction. Progress vs plan Fjord test completed Progress on composite cable delayed due to production problems Enovate Lubricator flow test completed Building of new RLWI-stack delayed Critical issues Development of field version of composite cable and identification of Statfjord Pilot Well. Groeningen tests. Completion of Enovate tests and design of field version Corrective actions Speed up Composite Cable project, more funding may be required to establish this as a service. Light well intervention
15
Oil fiscal measurement
16
Turbine meter for oil measurement
17
Orifice meter for gas measurements
18
Separation and measurement system
19
Oil measurement station (flow rate, salt and water content)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.