Slide 1 Completions, Commissioning and Start-Up Support Global Best Practices by Barry Cann MD qedi.

Similar presentations


Presentation on theme: "Slide 1 Completions, Commissioning and Start-Up Support Global Best Practices by Barry Cann MD qedi."— Presentation transcript:

1 slide 1 Completions, Commissioning and Start-Up Support Global Best Practices by Barry Cann MD qedi

2 slide 2 CCSU and ORA during FEED Defining Systems (R&R’s & Cost Estimate)

3 slide 3 CCSU and ORA Management & Planning New Best Practices EDW Data Link LOSH & MoCTrack & Trace Construction v Commissioning Attributes QA Exhibit to A Sheet Mapping

4 slide 4 Designed to bridge the skills gap by delivering Technical Integrity Standardisation. Embedded as corporate technology applications. For use in Completions, Pre- Commissioning, Commissioning, Start-up & Decommissioning. Shared reference data functionality. Modern Systems for CCSU Example: qedi GoTechnology ®

5 slide 5 Interfacing with Engineering & Procurement 3D Completions Status Visualisation

6 slide 6 Partnering with Construction Systems Integrated Schedule

7 slide 7 Execution of Pre-Comm and Comm Safety Management - PTW and LOTO

8 slide 8 Operational Readiness Assurance Tracking and Verification Systems

9 slide 9 Benefits to Project and the Operating Asset An efficient transition to C&SU Engineering & Procurement Installation & ConstructionCommissioning Concept or FEED MC Start-Up & Handover PC Significant risk reduction of project overruns (cost & schedule). Full audit trail for Technical Integrity of every part of the asset.

10 slide 10 1 st 2 months = ave. 90% capacity 1 st 2 months = ave. 45% capacity Days Operation post Start-Up Benefits to Project and the Operating Asset Timely and Safe start-up, Continuous Operation Which production profile would YOU prefer?

11 slide 11 AMEC Foster Wheeler PMC on Al-Zour Refinery is applying GoCompletions technology to achieve: – Visibility and assurance of construction progress and completion – Management of system and unit handover – Progress reporting on system/subsystem completion – Completion assurance of Pre-commissioning activities EPC/PMC is to end of Pre-Commissioning (RFC) Best practice – Consistency of approach through C&SU (Final Handover to Operations) KNPC, Amec Foster Wheeler and qedi