WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3 Operations Splinter 3 April 2002
2
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 2 of 8 COS Team at STScI Tony KeyesInstrument scientist keyes@stsci.edu keyes@stsci.edu Ken SembachInstrument scientist sembach@stsci.edu sembach@stsci.edu Claus LeithererInstrument scientist leitherer@stsci.edu leitherer@stsci.edu Matt McMasterData Analyst mcmaster@stsci.edu mcmaster@stsci.edu Wayne BaggettSystems engineer (operations) baggett@stsci.edu baggett@stsci.edu Marsha AllenSystems engineer (commanding) mallen@stsci.edu mallen@stsci.edu Ron PittsSystems engineer (commanding) pitts@stsci.edu pitts@stsci.edu Steve BarrowSystems engineer (commanding) barrow@stsci.edu barrow@stsci.edu Tom WheelerEngineer (operations) wheeler@stsci.edu wheeler@stsci.edu John AdamsTRANS developer – (scheduling) jmadams@stsci.edu jmadams@stsci.edu Brian SeitzTRANS developer – (scheduling) bseitz@stsci.edu bseitz@stsci.edu Phil HodgeScience software – calcos (calibration) hodge@stsci.edu hodge@stsci.edu Daryl SwadeOPUS/HDA Team Lead – (pipeline) swade@stsci.edu swade@stsci.edu Jim RoseOPUS developer – (pipeline) rose@stsci.edu rose@stsci.edu
3
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 3 of 8 COS Thermal-Vac MOU Goal: Catalog T-V data in Hubble Data Archive (HDA) with all necessary searchable keywords and indices Defines COS IDT, Ball, and STScI schedule of deliverables No update required to enumerate Target Acquisition (TA) component delivery as separate milestone – FSW available before FH/W, so no special action to get TA test images needed
4
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 4 of 8 COS Phase Development Plan (Rev 6, 10/26/01) Phase 1 (1/1/00 – 6/30/00) vMacro Development vReconfigurations Phase 2 (7/1/00 – 12/31/00) vNUV Timetag Mode + Darks vFUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) vFUV & NUV Accumulation Science Exposures vFUV & NUV Target Acquisition Exposures vFUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) vAperture Alignment Exposures vOSM1 Focus Alignment Exposures vOSM1 Rotation Alignment Exposures vOSM2 Rotation Alignment Exposures vFUV & NUV FP Split Exposures Phase 5 (1/1/02 – 6/30/02) vFUV & NUV GO Wavelength Calibration Exposures vFUV & NUV Flat Field Lamp Calibration Exposures vFUV & NUV Automatic Wavelength Calibration Exposures vSAA Contours Phase 6 (7/1/02 – 12/31/02) vSMGT Preparations vSMOV Special Commanding vFUV & NUV Anomalous Recovery vFUV & NUV Initial Turn-on vFUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) vFUV & NUV Lifetime Adjustments vCoordinated Parallels
5
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 5 of 8 COS Development Mileposts FSW 3.2 : February 2002 – Enables mechanisms, lamps – Required for realistic STScI commanding tests on ops bench STScI reconfigurations : 15 April 2002 – Required for realistic STScI commanding tests on ops bench = OPUS development key component = Front-end ground system key component
6
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 6 of 8 COS Development Mileposts STScI Ops Bench Testing: April 2002 – Macro timing SMS – Commanding certification SMS > required for final flight approval of STScI ground system components FSW 4.0 – July 2002 – Enables target acquisition – Not required for Thermal-Vac – Required for realistic STScI commanding tests on ops bench – Test images required for pipeline-verification and SMGT
7
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 7 of 8 COS Development Mileposts FUV/NUV Integrated SI test images: 15 Sept 2002 (2 month slip) – Required 1 month prior to delivery of final T-V OPUS/HDA product – More robust set than ops bench suite – (critical-path for OPUS delivery) OPUS/HDA T-V Delivery: 15 Nov 2002; (earliest TV – 2 months)
8
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 8 of 8 COS Development Mileposts Ball Thermal-Vac: January 2003 SI Delivery to GSFC: February 2003 SMGT: May 2003 Launch: February 2004