Download presentation
Presentation is loading. Please wait.
Published byCharlene Pearson Modified over 9 years ago
1
ECMS 2005 Riga 1 st – 4 th June 2005 VISUALISING LAYOUT AND OPERATION OF A CONTAINER TERMINAL Authors Dr F A Schmidt- Maritime & Supply Chain Solutions (Europe) Ltd, UK Miss R Yazdani- University of Ulster at Jordanstown, UK Mr R Young- University of Ulster at Jordanstown, UK 1
2
ECMS 2005 Riga 1 st – 4 th June 2005 2 EU SPONSORED PROJECTS RELATED TO PORT OPERATION: - modelling and simulation EU Aims: Spatial Development Perspectives, Sustainable Development and Balancing the Modes of (Freight) Transport SPHERE - 1996 – 99 - Initial Development of the Port Process Simulator BALTPORTS-IT - 2001 - 03 - Further Development of the PPS TRAPIST - 2002 – 04 - Development of the Terminal Planning Board
3
ECMS 2005 Riga 1 st – 4 th June 2005 SPHERE – Port of HarwichBALTPORTS-IT – Port of Gdansk Szczecinskie Quay TRAPIST – Terminal Planning Board TRAPIST – TPB – Port of CorkTRAPIST – Tivoli – Port of Cork - Port of Kokkola 3
4
ECMS 2005 Riga 1 st – 4 th June 2005 OPERATIONAL PROBLEMS IN SMALL TO MEDIUM SIZED PORTS AND TERMINALS Information Flow to / from and within the Terminal The Absence of extensive IT Support Cargo Flows to / from and within the Port or Terminal Layout of Land- and Maritime Approaches including Berths Position of in- and out-Gates Terminal and Yard Layout in conjunction with selected Cargo Handling Equipment 4
5
ECMS 2005 Riga 1 st – 4 th June 2005 OBJECTIVE To develop a Methodology for Data Gathering and its general Representation to visualise and resolve operational Problems in Ports and Terminals ~~ ~~ ~~ ~~ ~~ An Object Oriented Relational Database An Electronic Terminal Planning Board 5
6
ECMS 2005 Riga 1 st – 4 th June 2005 THE OBJECT ORIENTED RELATIONAL DATABASE The Partner Ports in TRAPIST and Freight Forwarders SPHERE, BALTPORTS-IT, TRIM, INFOLOG, BOBCOM, EUROBORDER, D2D, THEMIS, INTRA-SEAS, INTERPORT 24 FW4 and FW5 EU RTD Projects with emphasis on Freight related Data and Data Models used Based on Information obtained from: 6
7
ECMS 2005 Riga 1 st – 4 th June 2005 The Data Model 7
8
ECMS 2005 Riga 1 st – 4 th June 2005
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.