Download presentation
Presentation is loading. Please wait.
Published byOliver Horn Modified over 9 years ago
1
[Exercise Name] After Action Conference
2
[Date] [Exercise Name] Agenda I.Introductions & Opening Remarks II.Exercise Summary III.Items Identified IV.AAR Review V.Improvement Plan Development VI.Next Steps
3
[Date] [Exercise Name] Introductions Your name Your organization Your role during the exercise One key success during the exercise One key challenge during the exercise
4
[Date] [Exercise Name] Exercise Summary [Insert a brief description of the exercise including the scope, objectives (including Target Capabilities, activities, and scenario used to achieve objectives), ]
5
[Date] [Exercise Name] Exercise Objectives [Insert Exercise Objectives] 1.Objective 1 2.Objective 2 3.Objective 3
6
[Date] [Exercise Name] Scenario Synopsis [Insert brief summary of the exercise scenario]
7
[Date] [Exercise Name] Key Strengths and Accomplishments [Insert the key strengths from the exercise]
8
[Date] [Exercise Name] Key Areas for Improvement [Insert the key areas for improvement from the exercise]
9
[Date] [Exercise Name] AAR Review and Approval Report Section Section 3: Analysis of Capabilities Section 4: Conclusion Appendix A: Improvement Plan Appendix B: Lessons Learned (Optional) Appendix C: Participant Feedback (Optional) [Review the exercise AAR with participants and solicit feedback on its contents] Report Section Appendix D: Exercise Events Summary Table (Optional) Appendix E: Performance Ratings (Optional) Appendix F: Acronyms
10
[Date] [Exercise Name] Report Approval Process Decision by consensus Unresolved issues (e.g. consensus not attained) Consider compromises Refer to Exercise Directors Exercise Directors consult with applicable agency head
11
[Date] [Exercise Name] Improvement Plan Development Divide into groups Select a group leader and recorder Discuss each lesson learned Turn recommendations to actions Provide actions to facilitator Reconvene to brief actions to entire group
12
[Date] [Exercise Name] Writing Improvement Actions Determine action needed to fix the problem Choices No further action; already fixed No further action; not worth fixing Accept recommendation as is Choose new action—if so, write it
13
[Date] [Exercise Name] Writing Improvement Actions Generally plans, policies & procedures, training, equipment & facilities, outreach and inter-agency coordination, exercises All follow-up actions must have: What must be done (an action e.g., a verb) Who will do it (agency and POC) When it will be done (specify reasonable date)
14
[Date] [Exercise Name] Sample Improvement Action Template Use these templates as suggestions for refining recommendations. You need not match the wording exactly. (Who) will prepare/revise ________ plan to (correct what?) by (when). (Who) will prepare/revise ________ policy or procedure to (correct what?) (when). (Who) will conduct training for (group) in (what?) so that ________ by (when). (Who) will obtain/repair _______ equipment/facilities so as to __________ by (when). (Who) will conduct _________ study/analysis to __(action required)___ so as to _______________. (Who) will convene a working group of ___(people/agencies)___ to __(action required)__ so as to correct ___(what)___.
15
[Date] [Exercise Name] Improvement Plan Matrix Capability Observation Title Recommendation Corrective Action Description Capability Element Primary Responsible Agency Agency POC Start Date Completion Date [Capability 1: Capability Name] 1. Observation 1 1.1 Insert Recommendation 1 1.1.1 Insert Corrective Action 1 PlanningState X EMAEMA Director Dec 1, 2006 Sep 1, 2007 1.1.2 Insert Corrective Action 2 PlanningState X EMS System EMS System Director Dec 1, 2006 Feb 1, 2007 1.2 Insert Recommendation 2 1.2.1 Insert Corrective Action 1 TrainingState X EMAEMA Director Dec 1, 2006 Jan 1, 2007 1.2.2 Insert Corrective Action 2 Systems/ Equipment State X EMAEMA Director Dec 1, 2006 Mar 15, 2007 2. Observation 2 2.1 Insert Recommendation 1 2.1.1 Insert Corrective Action 1 PlanningState X EMS System EMS System Director Dec 1, 2006 Jan 15, 2007 2.1.2 Insert Corrective Action 2 Systems/ Equipment State X EMAEMA Director Dec 1, 2006 Jan 1, 2007
16
[Date] [Exercise Name] Action Brief Please indicate: Which items require no further action Recommendations with no change to actions Changed or new actions and why Facilitator will record revised actions.
17
[Date] [Exercise Name] Wrap-up Next Steps Memo report Follow-up progress meeting Closing Comments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.