Download presentation
Presentation is loading. Please wait.
Published byEmma McDaniel Modified over 9 years ago
1
1 Briefing for Blue Plains Regional Committee on Potomac Interceptor Capacity Analyses June 28, 2007 District of Columbia Water and Sewer Authority
2
2 Agenda Purpose Model Integration PI Design Basis M&E 2003 Model Results Review of Fairfax Request
3
3 Purpose Add Potomac Interceptor model to model of WASA system PI Model 2003 by M&E/COG SWMM Model from Potomac P.S. to PI WASA Model Danish Hydraulic Institute Mike Urban Model Includes combined sewers & major separate sewers to D.C. line Evaluate Fairfax request to add flow to PI – two scenarios Add 6.5 mgd (avg) Add 9.5 mgd (avg)
4
4 Model Integration - Completed Obtained model data & calibration from M&E Completed integration Converted to Mike Urban Confirmed calibration Potomac Interceptor DC Sewer System
5
5 PI Design Basis PI Flow At DC Line, MH-2 (mgd) Year Annual Rainfall (National)Annual Avg.Peak Hour Peak Hour/ Avg Flow Ratio Burns & MacDonald 1961 PI Design BasisN/A65.32151.172.3 Actual Data 200360.8651292.0 200442.5501152.3 200544.4501122.3 200647.8431232.9
6
6 M&E 2003 Findings Dry weather flows - 2025 RWWFM forecast Wet Weather Flows – per metering, regression analysis Offloads/System Configuration Loudoun & Fairfax offloaded to Broad Run at MH-56 WSSC Cabin John Flows >16 mgd diverted to PI Section of UPI out of service in DC is repaired so UPI flows no longer routed to PI Results of 5 & 10 yr storm runs 5-yr storm: PI surcharged, but no overflow 10-yr storm: PI not adequate PI surcharged capacity about 144 mgd at DC line (vs. 151.17 original design basis)
7
M&E Results: Flooding During 10 Year Storm 7 D.C.
8
Flooding locations during 10 yr storm M&E Results: Flooding During 10 Year Storm 8
9
M&E Flows in Model Ann. Avg. Flow (mgd) Peak Flow (mgd)IMA / LCSA Flow (mgd) Jursdiction Meter Name5-yr, 24-hr Storm10-yr, 24-hr StormAnn. AvgPeak WSSC CJ Dulles (to PI)-17.33 0.725.0 Muddy Branch6.1422.0325.8615.540.3 Watts Branch6.4914.9216.834.514.2 Rock Run0.963.00 0.93.7 Unmetered0.47---- WSSC Total14.0557.2763.0221.683.2 LCSA 18.1454.3360.00 Broad Run Offload4.3412.89 LCSA Total13.841.4447.1113.831.9 Fairfax Sully Road #14.0210.30 4.09.2 Sully Road #21.443.864.371.12.1 Rock Hill Road0.623.524.260.92.3 Sugarland Run6.8122.60 4.012.0 Great Falls12.1730.1133.038.722.5 Scotts Run4.7410.50 2.99.4 Pimmit8.3630.00 9.423.6 AT&T B30460.191.672.09-- Fairfax Subtotal35.89112.56117.14 (Fairfax Offload)(4.89)(14.22) Fairfax Total31.0098.34102.9231.081.1 Other Dulles Airport1.625.82 1.0- Total @ DC Line60.47139144 9
10
10 Comments on Prior Work Several jurisdictions predicted to have peak flows >> IMA peak allowance Not all flow was getting to PI because total peak flow >> PI capacity water levels exceeding ground level at inflow nodes for peak flow this excess volume is NOT entering the modeled PI system and is lost. These occurrences just show that problems could be expected in the according subsheds
11
11 Evaluations Requested by Fairfax IMA Allocation (mgd)Average Flow (mgd) Connection Point Meter NameAvg.Peak Scenario 1 – No Diversion to Noman Cole Scenario 2 –3 mgd Diversion from Difficult Run to Noman Cole Horsepen A1Sully Road #149.244 Horsepen A2Sully Road #21.12.122 Horsepen A3Rock Hill Road0.92.30.5 Sugerland Run 41277 Difficult RunGreat Falls8.722.51512 Scotts Run 2.99.455 Pimmit 9.423.677 Total31N/A40.537.5 Amount above IMA Allocation9.56.5 Amount above IMA Allocation after 1mgd flow swap with LCSA under negotiation8.55.5
12
12 Summary of Model Runs Dry Weather FlowsWet Weather Peaks PI Capacity Assessment RunFairfaxAll OthersFairfaxAll Others System Changes5-yr10-yr15-yr 1COG 6.3 Up to IMA limit NoneOK 2COG 6.3 Per regression NoneOKNo 3+9.5 mgdCOG 6.3Per regression NoneNo 4+6.5 mgdCOG 6.3Per regression NoneOKNo 5+9.5 mgdCOG 6.3Ann. Avg x 2.3Up to IMA limitNoneOK No 6+6.5 mgdCOG 6.3Ann. Avg x 2.3Up to IMA limitNoneOK No 7+9.5 mgdCOG 6.3Per regression Relieve PIOK Impact of peaks > IMA Add Fairfax flow but limit peaks to IMA Addit. CSO impacts Add Fairfax flow Note: No Fairfax offload to Broad Run – all flow in PI
13
13 Findings Agree with prior work (M&E/COG) PI capacity (2025): No Fairfax changes: Peaks not limited = 5 yr storm Peaks limited to IMA values = 15 yr storm + Fairfax adds flow Peaks not limited = 5 yr storm @ +6.5 mgd, <5 yr storm @ +9.5 mgd Peaks limited to IMA values = 10 yr storm
14
14 Options Additional metering – improve predictions Develop PI peak flow management strategy Add capacity Relief sewer or relining Probably increase impact on D.C. CSO