Download presentation
Presentation is loading. Please wait.
Published byGarey Poole Modified over 9 years ago
1
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC Detlef.Koschny@esa.int Interfaces during commissioning, cruise, fly bys – data flow Interfaces during commissioning, cruise, fly bys – Implementation Interfaces during comet phase – data flow Interfaces during comet phase - Implementation Presented at the Rosetta Science Operations Working Group Meeting (SOWG) #5, 11 Jul 2001
2
Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys - Data flow PI Teams EPS (tbd) Sequence Builder Data Analyst Management Ground Segment Management Data Archiving / Handling Science Operations Team RMOC Science communications, databases FCPs Pointing modes Flight dyn. Request files Stations and Facilities Management Data Systems Flight Control Procedures, execution times DDS Request Raw data Experimenter teams Flight Control Procedures Experiment Data Analysis Overall Planning Project Scientist Approval Raw data, auxiliary data, h/k Raw data Flight Dynamics Team (FD) Flight Control Team (FCT) Plans Telemetry Command history Trajectory, attitude Cal. data
3
Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys Implementation - I Experiment User Manuals Experimenter supports FCP execution RMOC executes FCPs Project Scientist approves uplink
4
Solar System Division DVK, 10 Jul 2001 Interfaces during commissioning, cruise, flybys Implementation - II Experimenters writes Flight Control Procedures, documented in User Manual RMOC translates them to ESOC procedures ESOC executes them under “control” of the Experimenter Science Operations Team puts together consolidated plan in advance of mission phase, interactively changes plans Project Scientist approves operations and changes Data can be retrieved from the DDS If a Payload Operation Request (POR) file is required, it will be transferred as in comet phase
5
Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Logical PI Teams EPS (tbd) Sequence Builder Data Analyst SOC Management Ground Segment Management Data Archiving / Handling RSOC RMOC Science communications, databases POR File SPLs, pointing, trajectory Flight dyn. Request files Stations and Facilities Management Data Systems Operational Requests, Pointing Requests Lander Operations Plan DDS Request Raw data Experimenter teams Experiment Sequence Building Experiment Data Analysis Timeline Integration Science Sequence Assembly Raw data, auxiliary data, h/k Raw data Flight Dynamics Team (FD) Flight Control Team (FCT) Plans Telemetry Command history Trajectory, attitude Cal. data Science ops planning
6
Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Implementation RSOC Science Planning System PI 1 computer PI 2 computer Lander Team computer DDS Relay Lan Ops Lan RSOC FTS RSDB MCS with archive Flight Dynamics System Router Physical interfaces 2001 Jul 08, dvk Firewall
7
Solar System Division DVK, 10 Jul 2001 Interfaces during comet phases Implementation - II The RSOC FTS (File Transfer System) is located at ESOC within the Relay Lan. It will be a cold-redundant SUN workstation, maintained 24 h per day If a file is transferred, the DDS recognises from the file name whether it is for the RSOC FTS. It will forward it to that machine On the RSOC FTS, incoming files are checked automatically (name, syntax check for OIOR/LOR files) and acknowledged The Science Operations Team will transfer files via secure ftp to its planning system Thus: There is only one physical interface for the Experimenter, the DDS at ESOC Security and reliability are ensured
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.