Download presentation
Presentation is loading. Please wait.
Published byMelanie Ramsey Modified over 9 years ago
1
© 2014 HDR, Inc., all rights reserved. L. Kevin Mosteller, PE, SVP-HDR BUILDING A ROBUST WATER MODEL TO EVALUATE LONG- TERM WATER SUPPLY OPTIONS FOR UNION COUNTY 2015 NC AWWA-WEA 95 th Annual Conference
3
Agreement with the Town of Norwood Permitting and Preliminary Engineering Effort o IBT Certificate (EMC) and Lake Use Permit (FERC) o Notice of intent o Public Hearings o Draft EIS o Public Hearing (EMC) o Adequacy Determination o IBT Process Project Branding Preliminary Engineering CURRENT PROJECT STATUS
5
Evaluating the Impact on Water Resources CHEOPS™ Base Model Developed for Progress (now Duke) Energy Reservoirs Included o Progress-Blewett Falls Lake, Lake Tillery o Alcoa-High Rock Lake, Tuckertown Reservoir, Narrows Lake, Falls Lake o USACE-Kerr Scott (Added as part of EIS) Hydrology Updated and Verified for EIS in Collaboration weith NC- DWR PREFERRED ALTERNATIVE-EXPAND INTAKE IN LAKE TILLERY AND RAW WATER TRANSFER TO UNION COUNTY
6
59-Year Hydrologic Record Daily Evaporation Impacts on Reservoirs Futire Water Use Projections to the Year 2060 for the Basin Impacts of Climate Change Inclusion of the Regional Low Inflow Protocol Monthly Distribution of Future Water Use FEATURES OF THE CHEOPS WATER MODEL
7
Lake Levels o Aesthetics o Water Withdrawal Water Outflows (Downstream Releases Water Quantity Management (LIP Impacts) Hydropower Generation MODEL RESULTS ANALYZED FOR FUTURE IMPACTS OF WATER SUPPLY ALTERNATIVES
8
Full Period of Record (POR) Drought 1 (1999-2003) Drought 2 (2006-2009) HYDROLOGIC PERIODS EVALUATED
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.