NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER (INDUSTRY ADVISOR) DR. KENNEDY (CUSTOMER) DR. NUXOLL (CLASS ADVISOR) Stoplight Pizza Wind Belt Generator
2
Introduction Team Members Project Background Block Diagram Design Challenges Risks Milestones Conclusion
3
Team Members Nicole Feliciano (Team Lead) Home Town: Aiea, Hi Favorite Hobby: Puzzles Interesting Fact: Don’t have a middle name Noor Husain (Team Member) Home Town: Kuwait Favorite Hobby: Reading Interesting Fact: Fluent Arabic, Persian, English
4
Team Members (Cont.) Kyle Grotjohn (Team Member) Hometown: Riverside, CA Favorite Hobby: Messing with my bike Interesting Fact: I love cheesecake John Figueira (Team Member) Hometown: Kapolei, Hi Favorite Hobby: Building models Interesting Fact: I really like free things, especially food
5
Background Developing Countries More efficient and smaller wind power Remote applications Wind Belt Faraday’s Law Narrows Bridge
6
Block Diagram
7
Design Challenges Placement of Magnets & Coils Must be stable One end of design Membrane Tension Loss of power Tension adjustment at end Stator vs. Coils Cost vs. efficiency Coils for cost Creating Coils Particular design Many prototypes and sealant
8
Risks SeverityLikelihood Magnet strength too lowModerate Frame does not support tensionHighModerate The coils do not cause an adequate magnetic field High Moderate Rectifier/Battery burn out due to too much charge ModerateModerate/Low
9
Milestones NumberDescriptionCompletion Date 1Project Proposal8/31/2012 2Due: Functional Specification, first complete draft (ver 0.9)9/21/2012 3 September Program Reviews Due: Functional Specification, advisor-approved draft (ver 0.95) Complete website Submit part list for approval 9/28/2012 4 Due: Functional Specification, final draft (ver 1.0) Project Support from Craig Henry and Allen Hansen 10/05/2012 5Due: Project Business Assessment10/12/2012 7October Program Reviews10/26/2012 8First Prototype constructed10/31/2012 9Due: Design Document, first complete draft (ver 0.9)11/02/2012 10 Due: Design Document, advisor-approved draft (ver 0.95) Deadline: Team Meeting with Peter Rachor 11/09/2012 11Due: Design Document, final draft (ver 1.0)Final Budget11/16/2012 12November Program Reviews Due11/30/12
10
Conclusion Team Stoplight Pizza Importance/Background Design and Challenges Risks and Milestones