2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006
2
Safety Monitors – background Define levels of storage that must be maintained through the winter period Introduced in 2004 to replace ‘Top-up’ ‘Top-up’ focused on maintaining security of supply: Safety Monitors focus is public safety Requirement of National Grid Gas’ Safety Case that action is taken to ensure storage stocks do not fall below the Safety Monitor levels - these decay as the winter progress
3
Gas Safety (Management) Regulations 1996 Requires anyone conveying gas in a network to prepare a Safety Case and for the Safety Case to be accepted by the HSE The Safety Case must contain particulars which describe arrangements for a number of items listed in Schedule 1 These are high level requirements which must be described in detail in the Safety Case – GS(M)R does not define how a specific requirement is to be met. The relevant requirement in Schedule 1 is clause 16 16 - Particulars to demonstrate that the duty holder has established adequate arrangements to minimise the risk of a supply emergency, where a “supply emergency" means an emergency endangering persons and arising from a loss of pressure in a network or any part thereof
4
GS(M)R Safety Monitors The GS(M)R Safety monitor arrangements form part of National Grid’s detailed demonstration that it has arrangements in place to minimise the risk of a supply emergency They address the risk posed by the possibility of insufficient storage being available for a 1 in 50 duration winter The arrangements have been accepted by the HSE as discharging our responsibility in this area and we have a legal obligation to follow those arrangements Any change in arrangements would constitute a material change to the Safety Case and National Grid would have to present a case which demonstrated that the new arrangements were at least as safe as the current arrangements
5
Safety Monitors – methodology Loads protected by Isolation NTS Interruptibles LDZ Interruptibles NTS Power Firm NTS Industrial Firm DM (excluding priority customers) Loads protected by Monitor Priority Firm DM Ireland Firm All NDM >5860 MWh NDM 2196-5860 MWh NDM 732-2196 MWh NDM 73-732 MWh NDM 0-73 MWh NDM Concept – sufficient gas held in store to support those customers who can not be physically isolated from the network, requirements include isolation process of large loads All loads categorised into two groups:
6
Supplies – assumptions (1) “Baseload” – non storage supplies that are not limited by ‘space’, includes: Beach Interconnector Grain (LNG Imports) 10 mcm/d supply risk to cover for supply uncertainty, notably import assumptions Supply (mcm/d)MaximumSeptember Assumptions December Assumptions Comments Beach327303~30392.5% max beach Grain1713~13 IC Imports4842~3075% new imports Supply Risk-10 Baseload Supplies392348 ~3800 GWh/d
7
Supplies – assumptions (2) Storage supplies Long – Rough Medium – Includes Hornsea and Hatfield Moor deliverabilities only Includes Hornsea, Hatfield Moor, Hole House Farm and Humbly Grove space (reduced at onset to reflect start-up uncertainty) Short – 4 LNG storage sites Total storage supply level ~ 110 mcm/d (~1200 GWh) Total storage space ~ 4000 mcm (~ 43,200 GWh)
8
Supply / demand component – loads protected by monitor
9
1 in 50 Firm load Baseload supplies underpins storage requirements (96% of supply)
10
1 in 50 demands by load type
11
1 in 50 load protected by isolation Isolation ~1300 GWh (120 mcm/d) Monitor (Supply / Demand)
12
1 in 50 load protected by monitor
13
Supply / demand component 10 mcm/d supply risk included in September analysis to cover for supply uncertainty, notably import assumptions Supply risk had to be identified at time due to UNC requirements Supply risk located in Long not to unsettle markets & Long considered lowest risk of monitor breach (GWh)September Assumptions Sept with 10 mcm/d supply risk Sept with re- allocation of supply risk December Assumptions Long4778679073116655 Medium586886586864 Short155376155358 Total55198052 7877
14
Non - supply / demand component – load protected by isolation
15
Safety Monitors – Protected by Isolation
16
Isolation Component Supply risk has a lesser impact than in supply / demand Isolation needs established from observed behaviour from winter exercises (Krakatoa, Moscow) Improved industry response would reduce isolation needs Support for Isolation process is up to 48 hours All above isolation needs are similar (GWh)September Assumptions Sept with 10 mcm/d supply risk Sept with re- allocation of supply risk December Assumptions Long910 1127910 Medium440 Short459676459651 Total18092026 2001
17
Total Requirement for December Final requirement is lower than combined needs of Supply Demand & Isolation due to some reduction for “double counting” i.e. Supply Demand for Day 1 and Isolation for Day 1 (GWh)Supply Demand IsolationCombinedFinal Requirement Long66559107565698720.5% Medium8644401304120216.4% Short358651100970040.2% Total787720019878888920.6%
18
Monitor profiles
19
Monitor Profile Methodology Storage space and duration requirements are known for all storage types for protected by monitor and protected by isolation Protected by monitor is a winter long requirement Protected by isolation is a one off requirement Need to develop 2 key relationships: Demand days and temperatures (CWV’s) Latest dates in a winter when such temperatures could occur Days on Load Curve Supply Demand Isolation Long2662 Medium611 Short24
20
Day Number / Temperature Relationship Long isolation Long supply / demand
21
Calculation of Profiles Protected by isolation is a one off requirement Need to identify latest date when isolation could occur A different requirement is calculated for each “Day” i.e. the Day 1 requirement is much earlier in winter than say Day 62 Protected by monitor is a winter long requirement Need to identify latest requirement Need to identify earlier needs to establish within year profile – review all previous winters Profiles are then combined
22
Latest occurrence of cold (isolation)
23
Long safety monitor profile Monitor Isolation