Presentation is loading. Please wait.

Presentation is loading. Please wait.

Direct Project Virtual Connect-A-Thon January 2016.

Similar presentations


Presentation on theme: "Direct Project Virtual Connect-A-Thon January 2016."— Presentation transcript:

1 Direct Project Virtual Connect-A-Thon January 2016

2 12/06/10 Agenda »Introduction and Overview »Update on Java RI 5.0: Greg Meyer »MaxMD Certificate Discovery Tool: Bruce Schreiber »NIST Direct Tooling Update: Andrew McCaffrey, Dragon »Ready, Set, Connect!!!!

3 Connect-A-Thon 3 Connect-A-Thon focused on interoperability testing Already have instances stood-up Want to test them against other implementations Increased focus on negative and edge case scenarios

4 Connect-A-Thon 4 »Goals General HISP interoperability Test new RI implementation and bug fixes Enhanced private key protection Config UI DNS Policy Enablement Regression testing HIMSS Pre-testing

5 Connect-A-Thon 5 »Addressing test cases Trusted sender to trusted recipient Trusted sender to untrusted recipient –Missing, expired, or revoked certificate Trusted sender to trusted and untrusted recipient Untrusted sender (on receiving side) to trusted recipient

6 Connect-A-Thon 6 »Negative Receipt Tests Unencrypted payload Encrypted, no signature Encrypted, bad signature Message not verified Corrupt encryption Chain can not be build Untrusted trust anchor Expired certificate »Negative Send Tests Tests Chain can not be built Untrusted trust anchor Expired certificate

7 Questions? 7


Download ppt "Direct Project Virtual Connect-A-Thon January 2016."

Similar presentations


Ads by Google