Download presentation
Presentation is loading. Please wait.
Published byThomasina Howard Modified over 9 years ago
1
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure February 13, 2004
2
Notice of Inquiry on Natural Gas Infrastructure Background April 15, 2003 – the Commission issues the NOI Responses requested by May 30, 2003 September 10, 2003 ACC workshop Comments on workshop and strawman proposal requested by September 25, 2003 December 18, 2003 ACC Policy Statement Regarding New Natural Gas Pipeline and Storage Costs NOI related documents can be found at: http://www.cc.state.az.us
3
Existing Natural Gas Infrastructure Pipelines – El Paso, North Baja, Questar, Transwestern Storage – None in Arizona
4
Proposed Infrastructure Projects Pipelines – Desert Crossing, El Paso Line 1903, Kinder Morgan, Pacific Texas, Power Up, Sempra, and Transwestern Storage – Copper Eagle, Desert Crossing, Red Lake, Unocal LNG Terminals – Southern California and Baja Mexico
5
Agenda 1. Introduction 2. Background and Summary of Notice of Inquiry Activities 3. Natural Gas Supply – National Petroleum Council Report 4. Brief Updates on Potential Arizona Natural Gas Infrastructure Projects 5. Issues for Discussion Commission process to consider applications Contents of an application to the Commission Experiences with other similar processes in other jurisdictions – Kansas, other Factors for Commission to consider in evaluating any application Development of a performance standard Alternate cost recovery mechanisms Other issues 6. Where do we go from here? 7. Wrapup.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.