GRIC Case Study Permit Review Dan Blair, Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality
2
Background: Gila River Indian Community Akimel O’odham (Pima) & Pii Pash (Maricopa) Located in Maricopa & Pinal counties Established in 1859 by Executive Order 374,000 acres Population 15,500 people (on- reservation)
4
GRIC Permit Review Received Notice of Proposed Power Plant from Pinal County (2001) GRIC does not currently have authority under Section 505 (Courtesy Notice) Public Notice Contains General Information of Proposed Project (see handout “Public Notices”) GRIC contacted Pinal County AQCD for complete copy of Permit Application
5
GRIC Permit Review (cont.) Received Proposed Permit Application from Pinal County (dated 2000) 600MW Natural Gas Fired Power Plant (peaking ) Simple Cycle Turbines Option 1 - 12 LM 6000 turbines Option 2 - 6 LM 6000 turbines and 2 GE FA turbines
9
GRIC Permit Review (cont.) Facility major PSD source of NOx and CO > 250tpy PM 10 and VOC < 250tons/yr but exceeds significance level and requires PSD review
10
GRIC Permit Review (cont.) Pinal County in attainment for NOx, SOx, PM 10 and VOCs Pinal County AQCD is agency responsible for permitting facility Facility must obtain PSD Permit Title V Operating Permit and comply with Title IV Acid Rain requirements
11
GRIC Permit Review (cont.) Title V operating permit required because NOx, CO, PM 10 and VOCs > 100tpy Facility also subject to Title IV, Acid Rain requirements due to > 25 MW capacity
12
GRIC Permit Review (cont.) Sundance Energy (Proposed) Annual Emissions 12 GE LM 6000 SPRINT Turbines (Permit App) NOxCOPM 10 SOxVOC Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) 1563.92839.2195.035.1167.7
13
GRIC Permit Review (cont.) Permitee proposed in application that SPRINT atomized water spray system increased efficiency and Reduced emissions to level of Best Available Control Technology (BACT) or 25ppmvd Annual potential emissions based on 6500 hours/year at 100% load HAPs emissions calculated < major source thresholds
14
GRIC Permit Review (cont.) Emissions modeled to determine impacts on Visibility Soils Vegetation in two Class I areas within 100 km Superstition Wilderness Area (55km) and Saguaro West National Park (75km) PSD Class II increment analysis for Nox conducted Ambient Air Impacts below ambient air quality standards and PSD Class II significant levels for all pollutants
15
GRIC Permit Review (cont.) Why GRIC concerned Modeling indicated highest area of pollutant impact on eastern ridges of Sacaton Mountains within GRIC (NOx & PM 10 ) Hig- impact area near town of Sacaton Permit proposals for additional power plants (18) in greater Phoenix area Other Turbine plants proposing SCR for NOx control to 5 ppmvd
21
GRIC Permit Review (cont.) GRIC submitted comments (see Handout) concerning High NOx emissions Cultural concerns Adverse air quality impacts Pinal County reevaluated BACT analysis in response to GRIC comments, required facility to install SCR, reducing NOx emissions from proposed 25 ppmvd to 5.0 ppmvd
22
GRIC Permit Review (cont.) Total NOx emissions reduced from 1563.9 tons/yr to max of 448 tons/yr
23
Conclusion When commenting on a permit, pick a pertinent issue to comment on Emissions MACT, BACT, LAER Pipeline/power line issues Cultural issues Transport of fuels Water availability, etc.
24
Conclusion (cont.) Comments simply stating you don’t want plant built will be ignored