ME444 ENGINEERING PIPING SYSTEM DESIGN
CHAPTER 3 : PIPE DRAWING AND FLOW THEORY
2
LAST SESSION PIPES VALVES ACCESSORIES PUMPS
3
CONTENTS PIPE DRAWING COST ESTIMATION
4
1. PIPING DRAWING DRAWING IS A UNIVERSAL LANGUAGE
5
TYPES OF PIPING DRAWINGS
FLOOR PLAN SINGLE LINE DOUBLE LINE SCHEMATIC or RISER FLAT ISOMETRIC DETAIL DRAWING 2D 3D
6
SYMBOLS - FITTINGS
7
SYMBOLS – FITTINGS (2)
8
SYMBOLS - JOINTS
9
SYMBOLS - VALVES
10
SYMBOLS - FIXTURES
11
SYMBOLS – PIPES (1)
12
SYMBOLS – PIPES (2) MORE IN PUMPING STATION DESIGN
13
PIPING DRAWING - FLOOR PLAN
14
PIPING SYSTEM SCHEMATIC DIAGRAM (FLAT)
15
SCHEMATIC DIAGRAM (ISOMETRIC)
16
PROCESS SCHEMATIC DIAGRAM
17
3D PIPE DRAWING
18
DUCT DRAWING
19
DIMENSIONING
20
EXAMPLE CONTENTS OF WORKING DRAWINGS
COVER LIST OF DRAWINGS LIST OF SYMBOLS EQUIPMENT SCHEDULE MASTER PLAN UTILITY OUTLETS (OPTIONAL) OVERALL SCHEMATIC (OPTIONAL) SYSTEM1 SCHEMATIC DIAGRAM FLOORPLAN(S) DETAIL/SECTION SYSTEM2 …
21
COVER
22
LIST OF DRAWINGS
23
LIST OF SYMBOLS
24
MATERIAL AND EQUIPMENT SCHEDULE
25
MASTER PLAN
26
UTILITY OUTLETS (OPTIONAL)
27
OVERALL SCHEMATIC (OPTIONAL)
28
MACHINE ROOM LAYOUT
29
SYSTEM1 SCHEMATIC
30
SYSTEM1 FLOOR PLAN
31
TYPICAL DETAILS
32
Advanced Pipe Design Software
33
BIM ready BIM = Building Information Modeling
34
2. COST ESTIMATION B.O.Q. B.O.M. OR BILL OF QUANTITY BILL OF MATERIALS
MATERIALS TAKE-OFF FROM DRAWINGS MATERIAL + LABOR + PROFIT
35
B.O.Q.
36
B.O.Q. (cont’d)
37
SCOPE (MAY VARY) DESIGNERS PRODUCE TERMS OF REFERENCE (T.O.R.)
DRAWING + TECHNICAL SPECIFICATIONS COST ESTIMATION CONSULTANTS ARRANGE BIDDING SITE SUPERVISION MATERIAL/EQUIPMENT APPROVAL PROJECT MANAGEMENT CONTRACTOR GET THINGS DONE ACCORDING TO THE T.O.R. OWNER PAY
38
HOMEWORK www.me.engr.tu.ac.th/HW3.dwg
Draw schematic diagram of the soft water (SW-F) piping system.