Team Greywater Brittany Park Dennis Petersen Jon Isaacs
2
Design and Install non-seasonal Greywater System at the South Co-Op Meet all City and State Requirements Objectives
4
The Outside Wall: Greywater System Location
5
Rain Water Collection Co-Op Roof 27.75’ 36’ 6’ Total Roof Area = 1022 ft 2 Average Rainfall in Corvallis, OR Average Rainwater Volume per Month
6
Data Collection
7
Methods
9
Future Work 5’ 2’ 1’ From Sinks To Filter To Toilet
10
Permitting Greywater SystemRainwater Tank Final Piping Plans Specifications of BRAC System Manufacturer’s Installation Instructions Final Piping Plans Specifications of Rainwater Tank
12
Dave Eckert (Project Sponsor) Dr. Harding (Senior Capstone Professor) Jason Blake-Beach (Co-Op Manager) Peter Byrne (BRAC Dealer) Paul Cooke (Plumber) David Hensley (Corvallis Plumbing Inspector) Acknowledgements