Download presentation
Presentation is loading. Please wait.
Published byIra Hoover Modified over 9 years ago
1
Field Robot 2016 Intermediate Report 2
2
training field robot
3
Current AS status Toolchain – Simulink + Simulink to C – C++ dll glue library – Visual studio and C# Specifications – Data buses – Reference cordinates – SI unit conversions
4
Current project status Rules of the competition published Workgroups – Local user interference – Internal CAN messages – Electric system – IoT communication – Axle module design – Sowing trailer specification – Weed detection / machine vision
5
Simulink model
6
Fishtail state machine
7
Future plans Team captain is chosen More independent working Independent project management 2016 Less teaching sessions Disassembly of previous robot Machining exercises Reassembly of previous robot
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.