Download presentation
Presentation is loading. Please wait.
Published bySilvia Nichols Modified over 9 years ago
1
Ozone Mapping and Profiler Suite Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. A-1 6 November 2008 OMPS Proto-Flight Model (PFM) Delta Pre-Ship Review ( PSR) 6 November 2008 Boulder, Colorado Pre-Ship Review
2
Ozone Mapping and Profiler Suite A-2 Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. 6 November 2008 Delta PSR Agenda TimeSectionTopicPresenter 08:00 – 08:15AIntroductionAsbury 08:15 – 10:00BStatus of PFM Deliverables and PSR LiensAsbury 10:00 – 10:15CPlan for OMPS GSE for NPPCrouch (NGST) 10:15 – 11:15DIssues Resolved Since PSRFarwell 11:15 – 11:45EDelta PSR Summary AssessmentYeiser (NGST) 11:45 – 12:00FMA StatusThompson 12:00 – 12:30Lunch (Provided) 12:30 – 13:15GAction Item StatusRadwick 13:15 – 14:00HResidual Risk Assessment – Delta from the PSRRadwick 14:00 – 14:30INGST/IPO/BATC Mission Success AssessmentIkemoto / Furlong / Thompson 14:30 – 15:30NASA IRT Caucus / PSR Board Caucus 15:30 – 16:00JNGST Delta PSR Summary AssessmentYeiser (NGST) 16:00 – 16:30IRT / PSR Board Report Out and ClosurePacini / IPO, NASA, NGST Pre-Ship Review
3
Ozone Mapping and Profiler Suite A-3 Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. 6 November 2008 ITAR Statement Data provided during this review may be controlled under United States export control laws. Therefore, Ball Aerospace will not knowingly export this information without prior review and authorization. In this context, export includes providing the information to other than an “Authorized U.S. Citizen” who is “In the U.S.” as defined by ITAR regulations. You are not authorized to attend this meeting if: –You are not an American Citizen nor a lawful permanent resident of the U.S. –You work for a foreign company or government or in a foreign location, even if you are a U.S. citizen Pre-Ship Review
4
Ozone Mapping and Profiler Suite Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. A-4 6 November 2008 PSR Introduction Scott C. Asbury, PMP OMPS Program Manager PSR Introduction
5
Ozone Mapping and Profiler Suite A-5 Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. 6 November 2008 PSR Purpose ─ Demonstrate OMPS PFM is Ready for Delivery Nadir Science-Grade Algorithms – Dec ’02 (Delivered) Limb Science-Grade Algorithms – Mar ’03 (Delivered) Proto-Flight Model (PFM) for NPP – 20 Oct ’08 (19 Sep ’08 Goal) One (1) Telemetry Simulator (FVS) for NPP – Mar ’05 (Delivered) Three (3) Telemetry Simulators (FVS) – Jul ’05 (Delivered) Deliverable EGSE & GSE – 15 Feb ’11 (27 Dec ’10 Goal) Flight Model 2 (FM2) for NPOESS – 15 Feb ’11 (27 Dec ’10 Goal) One (1) High-Fidelity Simulator (EEM) – 1 Mar ’10 Two (2) Instrument Test Operator Consoles (ITOCs) – 1 Mar ’10 & 15 Feb ‘11 PSR Introduction
6
Ozone Mapping and Profiler Suite A-6 Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements of U.S. export laws and regulations and may require advance authorization from the U.S. government. 6 November 2008 PSR will Demonstrate OMPS Readiness to Ship OMPS PFM Ready for Delivery to NGST for NPP Integration –Flight hardware and software is complete and ready –Planned & contractually required acceptance testing is complete –All 967 requirements verified and approved by BATC, NGST, IPO and NASA –All waivers submitted and approved by NGST and SEWG Open Liens from PSR Addressed –All category 1 liens (gate to delivery in place) are closed –The category 2 lien (gate to IIRR) is closed –Category 3 liens (gate to EIDP) are closed, with the exception of: »6 action items: responses provided – awaiting customer concurrence »1 PSR checklist item: DD-1149 – NGST action Issues Since PSR Have Been Addressed and Residual Risk is Understood –All residual risks are low to moderate, with the majority being low FCA/PCA Completed Ahead of the 10 Nov ’08 Baseline Plan PSR Introduction
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.