Download presentation
Presentation is loading. Please wait.
Published bySolomon Butler Modified over 9 years ago
1
SMWG-JAXA April 20071 JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi yagi.nobuhiro@jaxa.jp 25.April.2007 Telecon
2
SMWG-JAXA April 20072 1.JAXA SLE-Service Management Status JAXA is now developping the SLE-SM/UM prototype according Red-1 version (March 2006). The development of the SLE-SM/UM prototype is scheduled to complete by 11 Sep 2007. 2.JAXA SLE-Transfer Service Status Up-grade to RAF(911.1-B-2) and F-CLTU(912.1-B-2) is under way. Up-grading to the RAF & F-CLTU is scheduled to complete by 30 Aug 2007.
3
SMWG-JAXA April 20073 3.Documents For data-interface testing, - The Draft TEST PLAN FOR JAXA-JPL SLE INTEROPERABILITY TEST was made and sent to JPL on 20 April. - The test plan Includes the SLE transfer services(RAF & F-CLTU) interface testing, because JAXA/Tukuba’s SLE equipment have not conected to JPL - JAXA would like JPL to review the draft test plan. For Shawdow Track testing, - JAXA is now developping the TEST PLAN FOR JAXA-JPL SHADOW TRACK TESTING. - The development of the TEST PLAN is scheduled to complete by 22 June 2007.
4
SMWG-JAXA April 20074 4.Service Agreement The Draft Service Agreement was made and sent to JPL on 20 April. Some parameters need to be defined. ie.JPL RF equipment Characteristic,JAXA spacecraft modulation type:PCM/PSK-PM
5
SMWG-JAXA April 20075 5.Issues to be determined in the near futuer JAXA proposes to conduct a communication test. -ICMP,SNTP level Produce ICD level information - selection of the line for Transfer services (ISDN,capacity) - exchange of network infomation ie.IP address - voice communication - security for Service Management message - Email rule for Service Management message (contents, subjects)
6
SMWG-JAXA April 20076 year 2007 month AprilmayjunejulyAugSepOct SLE-SM/UM prototype development with Red-1 SLE-Transfer Service RAFand CLTU up-grade with version-2 Shawdow Track Testing Schedule of JAXA SLE-SM/UM prototype development & testing with JPL (tentative) ▲(11 Sep) data interface testing ▲(30 Aug) data interface testing (1 Oct)▲ Shawdow Track