Margaret St Bike Blvd & McKnight Trail Reuben Collins Department of Public Works Capital and Transportation Planning
2
In a Nutshell ASK: $400,000 PURPOSE: Design YEAR: 2017 WHY: Prepare for 2018 Construction
3
The Project Margaret Street Bike Blvd McKnight Road Trail Bike Blvd: Low Volume, Low Speed, Residential Roadway Parallel to high volume arterial
4
This sounds familiar… 2014 CIB Funds: $100,000 We used that money for: Public Process Concept Identification Initial Implementation Project Website: http://www.stpaul.gov/index.aspx?NID=5463 http://www.stpaul.gov/index.aspx?NID=5463
5
Bike Blvd: 3 Essential Steps 1)Route Identification & Branding 2)Traffic Calming 3)Arterial Crossing Treatments
6
INSERT PICTURE OF ROUTE SIGNS
8
Bike Blvd: 3 Essential Steps 1)Route Identification & Branding 2)Traffic Calming 3)Arterial Crossing Treatments
9
Traffic Calming 85 th % Speeds: 28-34 mph Max Speeds: ???
10
2013 Daily Traffic Volumes Margaret = ~1,000 Forest = 2,300 Earl = 4,700 Johnson Pkwy = 11,300 White Bear = 17,500 Ruth = 6,600 McKnight = 15,700
11
Traffic Calming & Arterial Crossing Proposed Elements Atlantic Hazelwood Flandreau Hazel Winthrop Forest Earl Johnson Ruth White Bear McKnight TRAFFIC CIRCLES BUMPOUTS OTHER
12
McKnight Road
13
Existing Traffic Signals Minnehaha Conway Hudson
14
2016 Margaret
15
Federal Funding Request
16
Questions?