1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA;

Similar presentations


Presentation on theme: "1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA;"— Presentation transcript:

1 1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA; A. GADEA; R. MENEGAZZO: LNL P. JONES: Univ. Jyväskylä T. ENGERT; T. HABERMANN; I. KOJOUHAROV: GSI J. CACITTI; M. TRIPON: GANIL DSS tests in LEGNARO 22 nd to 25 th April 2008

2 2 AGATA – Ch. VEYSSIERE 09/07/2008 Goal of these tests Realized with the detector S001 To test the AXIS low voltage crate: –48V –±6V; ±12V for the preamps –6.5V for the HV Box (Proto #1) To test the HV box in an other environment (GSI (2006) -> LNL) To Test the last version of the GUI developed by GSI

3 3 AGATA – Ch. VEYSSIERE 09/07/2008 The “AXIS” Box

4 4 AGATA – Ch. VEYSSIERE 09/07/2008 The AGATA Box

5 5 AGATA – Ch. VEYSSIERE 09/07/2008 S001 – HV Box (proto #1)

6 6 AGATA – Ch. VEYSSIERE 09/07/2008 Poor Man’s Digitiser

7 7 AGATA – Ch. VEYSSIERE 09/07/2008 Means for the tests Comparatives tests: –Patrice Medina 48V / AXIS –±6V; ±12V NIM/ AXIS –6.5V AXIS + HV Saclay/ Silena module Following analysis from Dino Bazzacco: PStestsWeek17-1.doc

8 8 AGATA – Ch. VEYSSIERE 09/07/2008 Mechanical mounting of the LV crate Reference spectrum at high and low gain AXIS crate mounted (just grounded)  E HG = 2.52 keV at 1332 keV  E LG = 2.75 keV at 1332 keV

9 9 AGATA – Ch. VEYSSIERE 09/07/2008 Mechanical mounting of the PLC PLC mounted (outside of the cabinet) and switched on Replacement of the 24V PS of the PLC by a linear floating PS; 6V and 12V AXIS on  E HG = 2.57 keV at 1332 keV  E LG = 2.63 keV at 1332 keV

10 10 AGATA – Ch. VEYSSIERE 09/07/2008 Test of LV from AXIS (6V, 12V) versus NIM Final frequency spectra (100 k sample) before shutting down the HV Red:HG LV from Axis Green:HG LV from NIM bin Blue:LG LV from Axis Cyan:LG LV from NIM bin The spectra are very similar, with the ones using Axis slightly better at the lowest frequencies and those using NIM having lower amplitude in the peaks at 23 and 46 kHz.

11 11 AGATA – Ch. VEYSSIERE 09/07/2008 Test of the 48V (1/2) With the Patrice 48V With the AXIS 48V

12 12 AGATA – Ch. VEYSSIERE 09/07/2008 Test of the 48V (2/2) 48V AXIS with improvement on the grounding (copper braid shortened) With the Patrice 48V Green and blue when adding a 400 and 600W resp.

13 13 AGATA – Ch. VEYSSIERE 09/07/2008 Using a GPBox (dual core preamp. inside) Red: 6, 12 and 48 V Axis Green: LV NIM, 48V Patrice

14 14 AGATA – Ch. VEYSSIERE 09/07/2008 Comparison of AGATA and Silena HV Using AXIS LV Energy resolution (in keV) derived from INP UnfilteredFiltered with 3  s Filtered with 6  s HV Silena high gain 15.21.751.43 HV AGATA high gain 15.41.661.44 HV Silena low gain 18.61.821.59 HV AGATA low Gain 18.81.741.62

15 15 AGATA – Ch. VEYSSIERE 09/07/2008 Noise spectra after 6  s shaping trapezoidal shaping RedHV Silena (high gain signal) GreenHV AGATA “” BlueHV Silena (low gain signal) CyanHV AGATA “”

16 16 AGATA – Ch. VEYSSIERE 09/07/2008 Integrated power spectra after ~6  s trapezoidal shaper RedHV Silena (high gain signal) GreenHV AGATA “” BlueHV Silena (low gain signal) CyanHV AGATA “” keV

17 17 AGATA – Ch. VEYSSIERE 09/07/2008 Problems to be solved: Voltage regulators associated to long cables generate oscillations: regulators to be changed, Temperature too high in the 48V module: –Geometry to be modified to improve the air path on the heat sink, –Vicor 600W PS to be tested. To check its influence on the signal, –Water cooling? When profibus is reconnected, the crate stops briefly, Safety of the 6 and 12V should not be linked with the 6.5V (when 6 and 12V stop, HV stops also), 48V offset to be reduced, Connectors (front panel Sub-D, 24V connectors, Profibus-DP)

18 18 AGATA – Ch. VEYSSIERE 09/07/2008 Some problems can be avoided… Reconnecting the PA when voltage is set induces an inrush current that trigs the safety of the 6 and 12V: not to be done… Removing the safety on the overcurrent might be dangerous in some cases. July tests of revised AXIS box at Legnaro – on platform -Production Digitiser -Detector (Single detector ?) -Integration with rest of DSS ongoing