Dynamic Shock Modeling Darren Barlow Regional Technical Manager Perforating
2
Leon Moisseiff What if he had the ability to model? What does it cost if you have a major failure on a well? Disaster is intriguing if it’s not you!
3
Key Areas Workplusplace.com Fineartamerica.com
4
Large Guns
5
Modeling versus Reality 275’ of 6 ½ guns Reservoir 15K Red – Tubing Movement Blue – Packer Load Cyan - Tubing Load C/T 830,000 lbf 1.00 1000 -500
6
Avoiding NPT Packer 60m 7” UHSD Firing Head 10m 3 ½ 12.95 ppf Release Ported Sub
7
Pressures Equals Loading Red – Tubing Movement Blue – Packer Load Cyan - Tubing Load C/T
8
Strengthening the BHA Packer 60m 7” 18 spf UHSD Firing Head 10m 3 ½ 12.95 ppf Release Ported Sub 10m 5 ½ Drillpipe
9
Confined Spaces
10
Isolation plug Running Tool Loss of well 10 Isolation Packer
11
Movement 11 CWOP – 5’ Depth of the well was 25,000+
12
Bridge Plug- Well Integrity 36m 7” Guns Bridge Plug Retrievable Packer 10m 62m * * Packer Bridge Plug 16 8 24 32 40
13
Unknowns
14
Component Failure 35m of guns Champ IV Packer Formation test string Pup Joint w/ Firing Heads Why was Failure NOT Predicted?
15
Post Failure Analysis Gauge Analysis: Reported k = 0.2 md Actual k = 0.02 md Changed perm and re-ran model Predicted failure @ 3244m Actual failure @ 3245m
16
How can modeling help your completion challenges? Darren Barlow Regional Technical Manager- Perforating Summary