1
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple Erection HYUNDAI FEATURES Make to order for each project High Quality Finishing
2
“High Efficiency Slab System” “Three Main Components Only” “No throwing of Formwork” AluminiumFormwork SLAB “50% Less Labours”
3
: Install Wall Reinforcement : Erect Wall Panels : Erect Deck Panels : Install Slab Reinforcement 5-8 days Per Floor SYSTEMATIC: 5-8 days Cycle : Pour Concrete Zone Casting Everyday HYUNDAI FORM Day 1Day 2Day 3 Day 4Day 5
4
AluminiumFormwork Everything cast together - wall - column - beam - staircase - liftcore
5
AluminiumFormwork Light weight Panel No need tower crane Lightweight panel, easily handle by Workers
6
AluminiumFormwork Quick & Easy to shift
7
Hyundai AluminiumFormwork Fast & Easier of installation & dismantle
8
AluminiumFormwork Short training time
9
AluminiumFormwork Reuse up to 200 times !
10
AluminiumFormwork Less wastage & damage Lesser hidden cost
11
AluminiumFormwork Lesser and cheaper Labour System formwork labour: Rm13.00 / m2 Conventional labour: Rm18.00 / m2
12
AluminiumFormwork Strip early Wall 10 hours, Slab 2 days Formwork 1 level Props 2 levels
13
AluminiumFormwork No need do any Plastering Reduces Cost of Architectural Touch up
14
ALUMINIUM VS Conventional (Conventional slow by 4-5 months) TIME = MONEY !!! 1)Bank interest 2)Operation expenses (tower cranes, labour and others) 3)Worker 4)Rubbish expenses