Download presentation
Presentation is loading. Please wait.
Published byMiles Fleming Modified over 9 years ago
1
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013
2
Muon Ionization Cooling Experiment Measure transverse (4D) Muon Ionization Cooling 10% cooling – measure to 1% (10 -3 ) Single-Particle Experiment Build input & output emmittance from ensemble Alan Bross AEM October 14, 20132 Tracking Spectrometer RF Cavities Focus Coils Magnetic shield Liquid Hydrogen Absorbers Fiber Tracker
3
MICE Beam Line Alan Bross AEM October 14, 20133
4
Schedule Alan Bross AEM October 14, 20134 TOF, CKOV, CAL
5
Schedule II Schedule has been driven by magnet delivery. Step IV need: u 2 Spectrometer Solenoids + 1 AFC Step VI need: u 2 Spectrometer Solenoids + 3 AFC + 2 Coupling Coil Magnet STATUS: u Spectrometer Solenoids s 1 at RAL, ready for installation s 2 nd still at vendor. Expect to ship by December u 2 AFCs delivered s First fully tested, but does not meet full spec. s Second to start testing in November u Coupling Coil s First coil under test at STF s First cryostat nearing completion at LBNL Alan Bross AEM October 14, 20135
6
Photo gallery Alan Bross AEM October 14, 20136 SS leaving vendor SS at RAL AFC CC Test at CHL (STF)
7
Alan Bross AEM October 14, 20137 RF for Step VI
8
Alan Bross AEM October 14, 20138
9
RF Power Alan Bross AEM October 14, 20139 First RF amplifier installed Tests early next year
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.