Download presentation
Presentation is loading. Please wait.
Published byAngelica Beasley Modified over 9 years ago
1
Task 4.3: Test implementation Marieke van Duin (NWO) ASTRONET Executive Board Meeting 26 February 2008
2
Key Facts Partners: BMBF, CNRS/INSU, FWF, MEC, NWO, SRC Budget: 3,2 M€ Theme: ‘Common Tools for Future Large sub-mm Facilities’
3
Flowchart
4
Electronic Submission System ASTRONET Joint Call website http://www.astronet-eu.org/Joint-call-for- proposals ASTRONET Iris http://www.iris.astronet-eu.org (don’t submit!) ASTRONET MS Sharepoint http://sp.astronet-eu.org
5
Electronic Submission System 1) 1)Obtain server certificates 2) 2)Installing server certificates 3) 3)Testing 4) 4)Adapting Iris / MS Sharepoint 5) 5)System online Steps 2 – 5: ≥ 1 week
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.