Download presentation
Presentation is loading. Please wait.
Published byRonald McBride Modified over 9 years ago
1
SON DG Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2122r1 Date Submitted: 2009-09-03 Source: SON DG Chairs E-mail:baowei.ji@samsung.com Baowei Ji Samsung Telecommunications America Venue: Re: Jeju Korea Base Contribution: IEEE C802.16m-09/2122r1 Purpose: To report SON DG activity in Session #63 Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7.html#6http://standards.ieee.org/guides/opman/sect6.html#6.3 Further information is located at and.http://standards.ieee.org/board/pat/pat-material.htmlhttp://standards.ieee.org/board/pat
2
List of SON Contribution in Session #63 SON related contributions: 15 Contribution #First authorsAffiliation C80216m-09_1658r2.pdfLinghang FanNEC C80216m-09_1659r1.docByung Wan YoonKT C80216m-09_1677.pdf Motoki Morita, Nader Zein,Linghang Fan, Tetsu Ikeda, Hassan Al-KananiNEC C80216m-09_1691r1.doc Byungwook Jun, Jaehee Cho, Anshuman NigamSamsung C80216m-09_1694.docJoey Chou. Et. AlIntel C80216m-09_1742.doc Jung-Mao Lin, Chie Ming Chou, Frank Ren, Wern Ho Sheen ITRI, Chaoyang University of Technology C80216m-09_1770.pdfJoey Chou. Et. AlIntel C80216m-09_1826.r1docChun-Yen HsuIII, NCU, NIU, TKU C80216m-09_1854.doc Sok-Hyong Kim, Yong-Sung Kim, Joo-Young Baek, Young-Joo SuhPOSTECH C80216m-09_1959.docBaowei JiSamsung C80216m-09_1969.pptYing Li,Samsung C80216m-09_2002.doc Guan-Yu Lin, Hung-Yu Wei, Yih- Shen Chen, I-Kang Fu, Paul ChengNTU/MediaTek C80216m-09_2010.docInuk JungLG Electronics C80216m-09_2024.doc Li-Chun Wang, Chu-Jung Yeh, I- Kang FuNCTU/MediaTek C80216m-09_2104.docMuthaiah VenkatachalamIntel
3
List of SON LB30 Comments in Session #63 SON comments: 8 Comment #CommentorAssocatiated Contribution # 1652Jaehee Cho#1691 1565Ying Li#1969 1550Joey Chou#1694 1551Joey Chou#1770 1602Chun-Yen Hsu#1826 1573Kaiying LvN/A 1527Linghang Fan#1658 1558Tetsu Ikeda#1677
4
Work Plan in Session #63 Contributions presentation and discussion Decided to postpone all SON related comments to Session #63.5 To establish SON DG Email List Setup DG Work Plan Discussed about DG Guideline Decided to cancel Tuesday Afternoon meeting
5
Work Plan Between #63 and #63.5 September 7, 2009, DG chair releases guideline for updating all 15 contributions, September 14, 2009, AOE, all updates of contribution should be available. September 15, 2009, DG chair releases the 1 st draft September 17, 2009, AOE, comments for 1 st draft ends. September 18, 2009, DG chair releases the 2 nd draft
6
Work Plan in Session #63.5 Have final DG text for TGm consideration in Hawaii meeting. Resolve all LB30 Comments
7
Guideline for Updating Contributions Each contribution must have proposed text Specific message formats should be provided if the contributors propose messages/signaling Specific text for AMS behavior must be provided if the proposal involves AMS operation Generally speaking, SON server does not fit into 16m scope. No details about SON server will be include in DG draft. Generally speaking, communications between ABSs does not fit into 16m scope. No details about inter-ABS communications will be included in DG draft. Need guideline from TGm about whether the over-the-air Femto ABS and Macro ABS communications is in 16m scope. –Opinion I: Should be included in 16m scope –Opinion II: Already discussed in NWG, may be more proper to discuss there
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.