Presentation is loading. Please wait.

Presentation is loading. Please wait.

EMR detector lying beam-face up in Geneva workshop.

Similar presentations


Presentation on theme: "EMR detector lying beam-face up in Geneva workshop."— Presentation transcript:

1 EMR detector lying beam-face up in Geneva workshop

2 EMR detector closed on its supports

3 Events from the cosmic run in EMR: top: x and y views of digital readout. There are two tracks! middle: the time over threshold readout (approximate pulse height: these are mips. (muons) bottom: time readout: clearly there is a red track and a blue track at different times.

4 a simple cosmic track

5 a more tilted single track

6 probably a low energy particle (lots of scattering)

7 several tracks at once, ‘a cosmic air shower’

8 another air shower

9 Event with a high energy photon

10 a more complicated one

11 a big splash

12 a decay?

13 EMR group :Etam, François, Ruslan, Alain and Yordan

14 Tuesday 24 September: loaded on the truck!

15 EMR installed in step IV position in the MICE hall

16 29 September -- EMR in the hall on its joint trolley with KL

17 2 October EMR is fully cabled

18 nominal MICE beam direction An Oxfordshire cosmic!

19 nominal MICE beam direction muon stop and decay (decay product at different time from primary)

20 nominal MICE beam direction Another muon stop and decay -- entering from the beam face now ready for beam!


Download ppt "EMR detector lying beam-face up in Geneva workshop."

Similar presentations


Ads by Google