Torna alla prima pagina TensiNet Final Meeting Design Guide
2
Torna alla prima pagina Chapter 10
3
Torna alla prima pagina Introduction n Pre-fabricated elements for lightweight structures n Fabrication process
4
Torna alla prima pagina Membrane fabricator n Why do we need experienced and qualified manufecturers?
5
Torna alla prima pagina Manufacturing process n Cutting pattern determination and workshop drawings n Acquisition of fabric n Incoming goods inspection n Test of the material, test of the seams and biaxial tests for compensation factors n Cutting
6
Torna alla prima pagina Manufacturing process n Welding: HF for polystere PVC, hot bars for fiberglass PTFE or others n PTFE processing n Inspection prior to shipping expecially to check if the most important measurements of the main sections (borders, holes, seam length) are among the tolerances required
7
Torna alla prima pagina Packing and Transportation n Importance of accuracy in packing and transportation expecially for particular kind of fabrics as fiberglass coated PTFE
8
Torna alla prima pagina Erection n A particular stage of the whole process n Large span structures with few supporting elements n Trained erection team
9
Torna alla prima pagina Maintenance n Depends on many factors such as design,material, function, environmental conditions and so on n Cleaning, normally required expecially for poliestere PVC fabrics and for flat roofs
10
Torna alla prima pagina Maintenance n It is important to prevent or eliminate problems for corrosion, obstructed water drainage and ponding and check regularly the stress values of cables and membrane