Symantec 2010 Windows 7 Migration EMEA Results
2
Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry 2
3
Key Topics Attitudes about migrating Manpower requirements Preparing for the migration General recommendations Results of the migration 3
4
4 Attitudes About Migrating
5
Timing and Motivations Typically wait six to 12 months Only 5% migrate immediately Performance, reliability and end-user experience motivated migration Most (57%) set ROI goals 91% met ROI goals 5
6
6 Manpower Requirements
7
Manpower requirements Typically involve almost half of IT staff Most automated the process 15 PCs worth automating Time consuming aspects: – Planning (18%) – Actual execution of upgrade (12%) – Reinstalling applications (10%) – Inventorying existing machines (9%) – Running pilot tests (9%) 7
8
8 Preparing for the Migration
9
Before the migration What to capture beforehand – User files & documents – Links to network drives – User profiles Processor speed, RAM, budget, PC age important 12 IT man-hours in preparation 9
10
Hardware recommendations CPU – Minimum: 2 to 2.5 GHz – Optimal: 2.5 to 3 GHz RAM – Minimum: 2 GB – Optimal: 4 GB Storage – Minimum: 200 to 500 GB – Optimal: 500 GB to 1 TB Video RAM – Minimum: 512 MB – Optimal: 1 GB or more 10
11
11 General Recommendations
12
General recommendations Standardization, added security, and virtual desktop 71% replace incompatible applications 12
13
Ensuring success / Easing the process Planning Training Pilot tests 13
14
14 Results of the Migration
15
Results of the migration 75% said process was smooth 56% said easier than last migration Most achieved key motivations Most ran into delays End-user satisfaction increased over time 15
16
Best vs. Worst Practices in Information Management Users offline 2 hours 60% of users extremely satisfied Differences 20 IT man-hours in preparation Extremely important: – Advanced planning (56% ) – Upgrading hardware (45%) – Pilot test (45%) – Training (44%) – Capture user profiles (42%) – Proper inventory (35%) Users offline 6 hours 25% of users extremely satisfied Differences 9 IT man-hours in preparation Extremely important: – Advanced planning (30% ) – Upgrading hardware (31%) – Pilot test (34%) – Training (26%) – Capture user profiles (27%) – Proper inventory (24%) Top tier resultsBottom tier results
17
17 Appendix All questions included
18
Expected use of Windows 7 18
19
User downtime 19
20
User downtime 20
21
Migration planning 21
22
Transition difficulty 22
23
Additional technologies 23
24
Delaying issues 24
25
Machine types 25
26
Machine types 26
27
Previous operating system 27
28
Influencing factors 28
29
When to upgrade 29
30
Economic impact 30
31
Current machines vs. new machines 31
32
Upgrading vs. fresh install 32
33
Communication 33
34
End user reaction 34
35
IT workforce involvement 35
36
Setting ROIs 36
37
Meeting ROIs 37
38
Affected factors 38
39
Minimizing cost 39
40
Successful migrations 40
41
Migration process 41
42
Automation vs. manual 42
43
Previous migrations 43
44
Previous migrations 44
45
Migration tools 45
46
Post-migration issues 46
47
Migration approaches 47
48
Migration approaches 48
49
Incompatible applications 49
50
Pre-migration captures 50
51
Helpful factors 51
52
Helpful factors 52
53
Pilot tests 53
54
Automatic vs. manual migrations 54
55
Hardware specifications 55
56
Hardware specifications / recommendations 56
57
Hardware specifications / recommendations 57
58
Hardware specifications / recommendations 58
59
Hardware specifications / recommendations 59
60
Hardware upgrades 60