PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching
2
PACS IBDR 27/28 Feb 2002 PACS ICC2 Milestones Funding until end of 2005: approved by DLR ICC training: 11/12 October @ MPE 28 participants, tutorial and demo sessions about all aspects and work packages of the Herschel mission relevant for the PACS ICC AVM-ILT test: starts beginning of April 2002 AVM/CQM test: starts April 2003
3
PACS IBDR 27/28 Feb 2002 PACS ICC3
4
PACS IBDR 27/28 Feb 2002 PACS ICC4 Current Tasks and Schedule IA/QLA Quick Look Analysis, Calibration Analysis, Trend Analysis, Automatic Test Analysis, Science Analysis Version 1.0.: end of March 2002 (mainly QLA plus IA environment) “Tiger Team” to investigate common IA structure: Report: April 4, 02 EGSE / HCSS development SCOS2000, MIB editor, test equipment, data model, TM/TC interface … EGSE integration at MPE: October 22/23 First EGSE-DPU tests at IFSI: January 14/15 (remote access from MPE possible !) HCSS version 0.1: Integration ongoing, Beta-release available in April
5
PACS IBDR 27/28 Feb 2002 PACS ICC5 Current Tasks and Schedule (II) Instrument Commanding On-board command procedures (OBCP), Common Uplink System (CUS), TC/HK parameter definition, test procedures… Ready for AVM: end March 2002 Ready for CQM: end 2002 CUS to be filled in March 2002 Calibration Def. of in-orbit cal. req., Input to ground-based cal. req. (test optics, cal. sources, astronomical sources) … 2nd draft of calibration document (IOCRD): Feb 15
6
PACS IBDR 27/28 Feb 2002 PACS ICC6 Current Tasks and Schedule (III) Simulations/Modeling Simulator as required by SIRD (to be used for end-to-end tests of operating procedures, AOT validation, SW tests etc.) under investigation Instrument simulator (to gain a deeper understanding of the instrument by simulating the complex effects and interactions of the many steps through telescope and instrument, e.g. noise, glitches, drifts, detector time responses etc.) 1 st version of (elements of) instrument simulator: mid 2002 (linked to AOT design) Management SIP ready March 18
7
PACS IBDR 27/28 Feb 2002 PACS ICC7 Current Tasks and Schedule (IV) System Engineering Quality assurance, config. control, ICC web pages, documentation and AI system … AVM-ILT operation (together with H/W Team) starting April 2002