Presentation is loading. Please wait.

Presentation is loading. Please wait.

V1 November 12, 2009 1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations.

Similar presentations


Presentation on theme: "V1 November 12, 2009 1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations."— Presentation transcript:

1 V1 November 12, 2009 1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSDPD SSD Division Chief or his representative will use this information to decide whether to promote a product enhancement into operations. These slides do not have to be briefed to the SPSRB. Routine modifications to an existing product that are handled through the NESDIS OSDPD change management process does not have to be briefed to the SPSRB, unless directed by OSDPD management or requested by the SPSRB. The template is a guide and may require tailoring. However, adherence to the briefing outline is recommended because it ensures the OSDPD is presented the information needed to make decisions. Guidance is contained in the notes page. You can access the notes page by selecting “View” and “Notes Page” from the main menu. Delete this slide before you send your brief to ─ Tom Schott ─ Stacy Bunin ─ SSD Division Chief (Dave Benner) ─ PIB Branch Chief (Antonio “Ricky” Irving) ─ SPSRB Executive Secretary and SPSRB Manager

2 V1 November 12, 2009 2 OSDPD Operational Promotion Report on the Product Enhancement for “project name” Project Lead(s): Name and Office Month Day, Year

3 V1 November 12, 2009 3 Background Project Lead(s): Project Name: Product Deliverable Name(s): Operational Center: Product Phase Dates: ─ MMM YYYY Development Phase Began ─ MMM YYYY Pre-operational Phase Began ─ MMM YYYY Operational Phase Began

4 V1 November 12, 2009 4 Background, Benefit, and Image/Plot

5 V1 November 12, 2009 5 Promotion Checklist #IPT Lead is responsible for completing these items Completed? / Comments? 1User coordination, endorsement, and approval 2Oversight Panel coordination, endorsement, and approval 3Implementation on primary and backup operational systems 4Implementation on distribution system(s) including archives if appropriate 5Documentation completion and/or updating 6Implementation of monitoring procedures 7Receive Office/Division Chief approval to declare operational status 8Announcement of operational enhancement promotion in Office/Division weekly/monthly reports 9Provide this completed briefing to Tom Schott Stacy Bunin SSD Division Chief (Dave Benner) PIB Branch Chief (Antonio “Ricky” Irving) SPSRB Executive Secretary and SPSRB Manager

6 V1 November 12, 2009 6 Product Deliverable Details Product Type and Number Product Delivery/Tracking Name Environmental Observational Parameters SatellitesSensorsN#N# E#E# R#R# T#T# O#O# Tailoring Options or Comments Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: N=New E=Enhanced R=Replacement T=Tailored O=Other

7 V1 November 12, 2009 7 Product Information for Satellite Products End-to-End Documentation System (SPEEDS) Product Name: Projected Date to Go Operational: Product Description: Product System: Platform: Satellite(s): Instrument(s) used: Channels: Horizontal Resolution: Vertical Resolution: Frequency: Coverage: Accuracy: Formats: Web Page: Product Oversight Panel: Users: Archive:


Download ppt "V1 November 12, 2009 1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations."

Similar presentations


Ads by Google