Download presentation
Presentation is loading. Please wait.
Published byShanon Sanders Modified over 9 years ago
1
10/11/20071 Business Continuity and Disaster Recovery Planning CMPE296T Fall 2007 Final Project Professor Richard Sinn Team Members Li Yang Smita Uniyal
2
10/11/20072 Agenda Introduction Examples of Threats Objective Of DRP Business Continuity Planning Business Impact Analysis Disaster Recovery Plan Testing and Simulation Globalization Conclusion
3
10/11/20073 Introduction What is business continuity and disaster recovery? An organizational effort to respond to potential threats that may render critical resources useless Disaster recovery and business continuity planning are processes that help organizations prepare for disruptive events.
4
10/11/20074 Examples of Threats Technological Computer crashes, network failure, malware infections, data theft Human Terrorism, theft, vandalism, political unrest Natural Fires, floods, earthquakes, storms, disease
5
Objective of DRP Minimizes system downtime and recovery time. Minimizes the risk of permanent loss of core assets or the entire organization. Minimizes confusion during a disaster. Minimizes decision-making during a high-stress time when emotions will be running high. Provides a platform in which to simulate various disaster recovery scenarios. 10/11/20075
6
Business Continuity Planning Allocate available budget for essential organization functions. Plan a failover mechanism. Prepare a Disaster Recovery Plan Prepare a Business Resumption Plan Prepare a Business Recovery Plan Prepare a Contingency Plan 10/11/20076
7
7 Business Impact Analysis Procedure to gather information on crucial systems and processes Basic areas to cover Contingency plan for absence of key personnel Simulate emergency scenarios Develop crisis communications with employees, customers, suppliers, outside world For partnership with local police, firefighters, etc. Continuously assess and improve performance
8
10/11/20078 Disaster Recovery Plan Addresses 3 key areas Prevention: pre-disaster Continuity: during a disaster Recovery: post-disaster
9
10/11/20079 Disaster Recovery Plan Consists of Clear concise procedures listed chronologically Don’t assume people carrying out procedures are those who wrote them Maintain up-to-date contact list Specify time it takes to carry out procedures Update DR plan on a regular basis
10
Testing and Simulation No amount of pre-planning can realistically prepare for the actual disaster itself Testing and simulation are useful methods to verify the effectiveness of DR plans
11
10/11/200711 Globalization A global workforce and supply chain forces corporations to monitor many sources of threats Example Floods in India SARS epidemic in China Solutions Technology Insurance
12
10/11/200712 Conclusion Disasters are always on the horizon; therefore every organization must have a plan to deal with it Globalization makes DR planning more critical Organizations must consider all aspects of business – especially personnel Good DR and BC planning does make a difference!
13
10/11/200713 [1] http://www.scotland.gov.uk/Resource/Img/94471/0023282.gifhttp://www.scotland.gov.uk/Resource/Img/94471/0023282.gif [2] Chin, P. (2005). Introduction to Disaster Recovery Planning. Retrieved November 23, 2007, from http://www.intranetjournal.com/articles/200503/ij_03_24_05a.html http://www.intranetjournal.com/articles/200503/ij_03_24_05a.html [3] http://searchstorage.techtarget.com/sDefinition/0,,sid5_gci801381,00.h tml http://searchstorage.techtarget.com/sDefinition/0,,sid5_gci801381,00.h tml [4] Mitchell, R. L. (2007). Four Disaster Survival Tips from Northrop Grumman. Retrieved November 25, 2007, from http://www.computerworld.com/action/article.do?command=viewArticl eBasic&articleId=9030438&intsrc=cs_li_latest http://www.computerworld.com/action/article.do?command=viewArticl eBasic&articleId=9030438&intsrc=cs_li_latest [5] Michael, G. (2006). Bombings, Floods, Plagues – Nothing slows India’s Outsourcing Boom. Retrieved November 26, 2007 from http://geekwhisperer.wordpress.com/2006/09/14/bombings-floods- plague-%E2%80%93-nothing-slows-india%E2%80%99s-outsourcing- boom/ http://geekwhisperer.wordpress.com/2006/09/14/bombings-floods- plague-%E2%80%93-nothing-slows-india%E2%80%99s-outsourcing- boom/ References
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.