Download presentation
2
Push and Pull Production Control Systems
Chapter Seven Push and Pull Production Control Systems
3
Schematic of the Productive System
Fig. 7-1 Schematic of the Productive System
4
The Three Major Control Phases of the Productive System
Fig. 7-2 The Three Major Control Phases of the Productive System
5
Typical Product Structure Diagram
Fig. 7-3 Typical Product Structure Diagram
6
Trumpet and Subassemblies
Fig. 7-4
7
Product Structure Diagram for Harmon Trumpet
Fig. 7-5 Product Structure Diagram for Harmon Trumpet
8
Product Structure Diagram for ICU2 Computer (for Problem 4)
Fig. 7-6 Product Structure Diagram for ICU2 Computer (for Problem 4)
9
Product Structure Diagram (for Problem 9)
Fig. 7-7 Product Structure Diagram (for Problem 9)
10
Kanban System for Two Production Centers
Fig. 7-8 Kanban System for Two Production Centers
11
Kanban Information System Versus Centralized Information System
Fig. 7-9 Kanban Information System Versus Centralized Information System
12
River/Inventory Analogy Illustrating the Advantages of Just-in-Time
Fig. 7-10 River/Inventory Analogy Illustrating the Advantages of Just-in-Time
13
CalcIt Model IT53 Scientific Calculator (Problem 41)
Fig. 7-11 CalcIt Model IT53 Scientific Calculator (Problem 41)
14
Product Structure Diagrams (for Problem 48)
Fig. 7-12 Product Structure Diagrams (for Problem 48)
15
Network Representation for Lot Scheduline (Example 7A-1)
Fig. 7A-1 Network Representation for Lot Scheduline (Example 7A-1)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.