Download presentation
Presentation is loading. Please wait.
Published byLizbeth Dalton Modified over 8 years ago
1
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 111 EFW Flight Software Summary Peter Harvey Space Sciences Laboratory University of California, Berkeley
2
RBSP/EFW I-PER 21 January 2011Harvey 112 FSW Overview Development Plan : RBSP_EFW_001_SMP Heritage : CRRES, Polar, Cluster, THEMIS Language: Z80 Requirements: 193 Level 3 Effort : 22752 SLOC in 22 modules & include files (596 pages) Test Platform: ETU Quality : Integrated with Flight Development Major Functional Requirements: – Command Reception & Distribution – Real-Time Data Collection and Playback – On-Board Evaluation for Burst Triggering – Burst Data Collection and Playback – Sine-Wave Fits of E-Field & Mag Signals – Spacecraft Potential Calculation – Data Compression – Boom Deployment Control – Space Weather Packet – Backup EMFISIS Magnetometer
3
RBSP/EFW I-PER 21 January 2011Harvey 113 Commands and Telemetry TM: 12000 bps - RT: 6763 bps ------------------- - PB: 5237 bps
4
RBSP/EFW I-PER 21 January 2011Harvey 114 CPU Utilization CPU Performance –Based upon 16.8 MHz processor –Measurements made on RBSP ETU DCB –Calculations in RBSP_EFW_FSW_004_Analyses.xls –Using Worst Case Compressable Data (10:1 compression) –Nominal Spin Rate (12 seconds) for Spin Fits
5
RBSP/EFW I-PER 21 January 2011Harvey 115 Memory Resources PROM/EEPROM PROM Functions EEPROM Load Uplink Support L&EO Functions EEPROM/Uplink One-Time Events Test Programs Initialization Params Science Upgrades RESOURCE NEEDS 48% PROM 49% RAM 0% EEPROM
6
RBSP/EFW I-PER 21 January 2011Harvey 116 Computer Resources
7
RBSP/EFW I-PER 21 January 2011Harvey 117 Action Items/Changes Status of Action Items Since CDR AI-8 : Required Long Duration Stress Test Completed 11/11/2009 Requirements Changes Since CDR EFW-206: Updated default “old data” as 42 days not 17 DFB-21: Added DCB-to-DFB Synchronization message TM-8: Real-time data increased from 6.2 to 6.7 kbps : Playback reduced from 5.7 kbps to 5.2 kbps : Meets “370 samples/sec” requirement w/ compression
8
RBSP/EFW I-PER 21 January 2011Harvey 118 FSW Action Item Long Duration and Stress Test (I-CDR AI #8) –Include a long duration as well as stress tests of FSW (maybe combined) –Maureen Bartholomew
9
RBSP/EFW I-PER 21 January 2011Harvey 119 Requirements of Test Test Requirements Length : 72 Hours Activities : High Rate of Commands High Rate of Telemetry Include Event Messages Include Memory Dumps Include CPU intensive Processing Pass/Fail Criteria : No Errors No Memory Leaks
10
RBSP/EFW I-PER 21 January 2011Harvey 120 Long Duration Stress Test High Rate of Commands –Command Pass Simulation Every Hour –Memory Load – Uplink of Script Database (1KB) –Serial Commands – 32 commands/sec for 60 seconds –Memory Dump Script Database –Execute Script and Verify Results High Rate of Telemetry –Continuous Telemetry at 200% nominal (24 Kbps) –Real Time Data @ 200% (12 Kbps) –Burst Playback @ 200% (12 Kbps) CPU Intensive Processing –Spin Fit Calculations @ 200% (6 second period) –Spacecraft Potential @ 200% (6 second period) –Burst Triggers (All 6 formulae active w/ 10 terms ea) (200% nominal) –Bias Sweeps every 30 minutes, Highest Frequency Possible –Data Compression Enabled on All Packets –SDRAM and SRAM Memory Scrubbing Enabled Verification –Test Status Logged Every Hour (72 reports) –No Errors in FSW or GSE –No Memory Leaks (by design, there is no dynamic memory allocation)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.