Continuous Gas-Lift Optimization: Offshore Gulf of Mexico April 13, 2005.

Similar presentations


Presentation on theme: "Continuous Gas-Lift Optimization: Offshore Gulf of Mexico April 13, 2005."— Presentation transcript:

1 Continuous Gas-Lift Optimization: Offshore Gulf of Mexico April 13, 2005

2 Introduction Background Technical Description Field Criteria Method Costs Qualifications Conclusion

3 Background SS 208—50 miles off coast of LA 90% of wells on continuous gas-lift Limited injection gas fluctuates Inefficient process to optimize gas-lift

4

5 Technical Description Constant Gas-Lift Injection Rate Real Time Wellhead Surveillance Optimization Well Tests Data to Desktop

6 Field Criteria Proper gas-lift equipment Inadequate data gathering from wells Need to decrease operating costs

7 Method New hardware on: Wellhead Gas-Lift Header Test Separator Computer hardware and software

8

9 Costs Total Cost = $860,000 Production Increase (BOEPD) Pay-Out ($40/BOE) (Days) 50430 150144 25086 35062 45048 55040

10 Qualifications Internship with UNOCAL at SS 208 Production Engineering course on gas-lift

11 Conclusion Similar field success Next step Questions