Continuous Gas-Lift Optimization: Offshore Gulf of Mexico April 13, 2005
2
Introduction Background Technical Description Field Criteria Method Costs Qualifications Conclusion
3
Background SS 208—50 miles off coast of LA 90% of wells on continuous gas-lift Limited injection gas fluctuates Inefficient process to optimize gas-lift
5
Technical Description Constant Gas-Lift Injection Rate Real Time Wellhead Surveillance Optimization Well Tests Data to Desktop
6
Field Criteria Proper gas-lift equipment Inadequate data gathering from wells Need to decrease operating costs
7
Method New hardware on: Wellhead Gas-Lift Header Test Separator Computer hardware and software
9
Costs Total Cost = $860,000 Production Increase (BOEPD) Pay-Out ($40/BOE) (Days) 50430 150144 25086 35062 45048 55040
10
Qualifications Internship with UNOCAL at SS 208 Production Engineering course on gas-lift
11
Conclusion Similar field success Next step Questions