Presentation is loading. Please wait.

Presentation is loading. Please wait.

6 May, 2003DASC-SC, Anaheim CA1 DASC-SC Agenda Anaheim, CA – 6 June 2003 Status Reports Awards Other Business.

Similar presentations


Presentation on theme: "6 May, 2003DASC-SC, Anaheim CA1 DASC-SC Agenda Anaheim, CA – 6 June 2003 Status Reports Awards Other Business."— Presentation transcript:

1 6 May, 2003DASC-SC, Anaheim CA1 DASC-SC Agenda Anaheim, CA – 6 June 2003 Status Reports Awards Other Business

2 6 May, 2003DASC-SC, Anaheim CA2 Status Reports 1029WAVESInactive 1076VASGActive 1076.1VHDL-AMSInactive –standard current 1076.1.1VHDL-AMS Std. PkgsActive 1076.2VHDL-MathActive 1076.3VHDL-SynthesisInactive? –Needs reaff soon

3 6 May, 2003DASC-SC, Anaheim CA3 Status Reports 1076.4VitalInactive? 1076.6VHDL Synth. Interop.Active 1164VHDL Std. LogicActive 1364Verilog ASGActive 1364.1Verlog Synth. Interop.Active 1481DPCInactive 1497SDFInactive 1499OMFInactive

4 6 May, 2003DASC-SC, Anaheim CA4 Status Reports 1551VHDL SID –To be admin. withdrawn 1577OOVHDLInactive 1603ALFIn ballot 1604Library IEEEInactive?

5 6 May, 2003DASC-SC, Anaheim CA5 Study Groups CHSTD SGInactive High-Perf Modeling SGInactive SLDL SGInactive VHDL M/W SGInactive? VLSGPAR at NeSCom


Download ppt "6 May, 2003DASC-SC, Anaheim CA1 DASC-SC Agenda Anaheim, CA – 6 June 2003 Status Reports Awards Other Business."

Similar presentations


Ads by Google