Download presentation
Presentation is loading. Please wait.
Published byLouise Bishop Modified over 9 years ago
1
The Astro Stallions present:
2
Team name: Astro Stallions Impact Date; July 6 Location: Moon’s north pole region Launch Time and Date: July 4 th at 11:59P.M. Spacecraft name: Urania I Duration of Journey: 4 days
3
Route and orbital Paths Leave July 4 th: - almost full moon at 11:59P.M. Orbit the earth once Transfer to the moon’s orbit Fire boosters to catch up to the moon Arrive July 6:- full moon Orbit around the moon until at the north pole Select crater Detach LRO After crash, inspect the dust
4
Navigational Instruments We will use DSN( deep space network), gyroscope, star tracker, computer, radar, transfer orbit, and accelerometer.
5
Methods, Guidance, Navigation, Tracking We will use solid rocket boosters and liquid rocket boosters for guidance, a gyroscope for tracking, a star tracker for navigation, transfer orbit for guidance, and an accelerometer and a gyroscope for helping us find the spacecraft’s speed and position
6
Navigation Map in separate file
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.