Download presentation
Presentation is loading. Please wait.
Published byGwendoline Crawford Modified over 9 years ago
1
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity, injection sequencing TL tests: TI2 and TI8 to downstream TEDs, weeks 23, 26 –instrumentation, controls and data, energy matching, trajectory, DFS, optics, aperture, multibunch Injection tests: TI2 and TI8, injection regions to LHC collimators, weeks 36, 37 –instrumentation, controls and data, trajectory, DFS, optics, aperture, dispersion matching, coupling, kicker waveform
2
TT40 to upstream TED – week 21
3
TT60 to upstream TED – week 21
4
TI8 to downstream TED – week 23 (w/e)
5
TI2 to downstream TED – week 26 (w/e)
6
TI8 to LHC IR7 – week 36 (w/e 29/30 th aug?)
7
TI2 to LHC IR3 – week 37 (w/e 5/6 th sep?)
8
General issues TT40/60 –TT40 interference with CNGS in W21 – move TT40 date or block 4-8 hours from CNGS programme? –“high intensity” beams and full LHC cycle ready in SPS for SPS W21? –Special conditions for high intensity to upstream TEDs – e.g. limit on total p+? –All conditions available for testing filling patterns and injection sequencing? TLs –Follow-up with LHC experiments, LHC access, LHC shutdown, etc. for TL tests… with OP - confirmed as Rossano? –Multibunch requirements for BI – 12 pilots OK? Experiments? –High(er) intensity beam to downstream TEDs? Injection tests –Scope of injection tests – plan for beam 2 to IR6 with LBDS? –Second injection test presently scheduled w/e of W37 but Jeûne Genevois (again). Can we aim at for TI8 29/30 th aug, TI2 5/6 th sep?
9
Other known issues Procedures, formalities and safetyWho Status Procedure for switching to and from BETSsimBrennan Procedure for ALICE and TL/injection screensVerena Solve the issue with MCIAV RBEND polarity procedureVerena/Rossano Update LBDS interlock commissioning procedureBrennan/Jan in progress Check access conditions to UAs during power testsBrennan/Mirko in progress Check general LHC access to RAs with kickers pulsingBrennan/Mirko in progress Check MKB exchange procedure validityBrennan in progress Check TCDI UJ88 exchange procedureBrennan in progress Notification memo of tests for RP/SC/DSOBrennan/Rossano Technical issues. MSI in DC - tests neededVerena/Jorg in progress Interlocking MKI against beam loss (vacuum interlocks)Verena/Brennan Water cooling for MKE6Francesco Acceptance tests of MKE systems at final voltage/pulse lengthMike B Acceptance tests of MKI systems at final voltage/pulse lengthMike B SoftStart specified and SW updatedJan/Etienne/Mike B in progress SoftStart HW interlock to BIC - redundant channels to implementEtienne/Jorg Check LBDS 2 BCTSs per line now implementedBrennan/Lars Check direct BLM monitoringBrennan/Lars Abort gap monitoring and cleaning deploymentMalika/Verena MKQA/AC dipole commissioning organisationJan in progress MKE6 to standby after interlock preventing extractionBrennan Modifications to allow MKI to pulse in test mode, plus testingJorg/Verena in progress New BTVDD filters installedBrennan/Lars done EMC tests - e.g. with LHCb magnet on, new QPS?Brennan BTVM turn-by-turn profile dataBrennan
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.