Download presentation
Presentation is loading. Please wait.
Published byMervyn Dennis Modified over 9 years ago
1
LBT Q1 2009 Eng/SW Review CIN/NIN -Computer and Network Infrastructure
2
4/6/09 LBT Q1 2009 Eng/SW Review Progress Mountain Network upgrade proposal. Mountain Network upgrade proposal. Complete and will be discussed in the Tuesday Management meeting along with managed switch requirements for upcoming projects Complete and will be discussed in the Tuesday Management meeting along with managed switch requirements for upcoming projects Private network for Backups for here and Mountain Private network for Backups for here and Mountain 50% complete 50% complete New computer racks with cable and power management New computer racks with cable and power management 80% complete and will be completed by end of Q2 80% complete and will be completed by end of Q2
3
4/6/09 LBT Q1 2009 Eng/SW Review Progress Cont. New TCS server hardware New TCS server hardware Has been installed and will be tested in Q2 Has been installed and will be tested in Q2 Memory upgrades for mountain workstations Memory upgrades for mountain workstations Norm has indicated he wants to replace these machines in Q2 Norm has indicated he wants to replace these machines in Q2 Telemetry server installation Telemetry server installation
4
4/6/09 LBT Q1 2009 Eng/SW Review Open Issues Technical Technical Mountain Network Upgrade Proposal Mountain Network Upgrade Proposal Schedule Schedule None None Budget Budget None None Resource Resource Network consultant helping to diagnose network issues along with Network Performance Monitoring Software. Network consultant helping to diagnose network issues along with Network Performance Monitoring Software.
5
4/6/09 LBT Q1 2009 Eng/SW Review Planning (Q2/2009) Install new Windows 2008 Server for Mountain Install new Windows 2008 Server for Mountain Install New Windows 2008 server for downtown Install New Windows 2008 server for downtown Replace unmanaged switch in 4 th floor network cabinet with 8 port Cisco Managed switch Replace unmanaged switch in 4 th floor network cabinet with 8 port Cisco Managed switch Upgrade NFS servers to Red Hat Linux Enterprise Upgrade NFS servers to Red Hat Linux Enterprise Test new client/server antivirus for windows Test new client/server antivirus for windows Install Altium license server on LBTHQFILE1 Install Altium license server on LBTHQFILE1
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.